Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0169 # 04 Y:1993 | 04 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $820 | $1,700 | Not Implemented |
AM0169 # 05 Y:1993 | 05 | 1993 | PAY UTILITY BILLS ON TIME | $540 | $0 | Not Implemented |
AM0166 # 01 Y:1993 | 01 | 1993 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $180,480 | $174,160 | Not Implemented |
AM0166 # 02 Y:1993 | 02 | 1993 | OPTIMIZE PLANT POWER FACTOR | $59,900 | $29,000 | Implemented |
AM0166 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,650 | $7,630 | Not Implemented |
AM0166 # 04 Y:1993 | 04 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,500 | $500 | Implemented |
AM0166 # 05 Y:1993 | 05 | 1993 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,630 | $1,830 | Not Implemented |
AM0166 # 06 Y:1993 | 06 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $500 | $75 | Implemented |
AM0167 # 01 Y:1993 | 01 | 1993 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $28,100 | $0 | Implemented |
AM0167 # 02 Y:1993 | 02 | 1993 | OPTIMIZE PLANT POWER FACTOR | $10,100 | $16,000 | Implemented |
AM0167 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,720 | $4,400 | Implemented |
AM0167 # 04 Y:1993 | 04 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,610 | $4,900 | Implemented |
AM0167 # 05 Y:1993 | 05 | 1993 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,970 | $2,450 | Not Implemented |
AM0167 # 06 Y:1993 | 06 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,290 | $0 | Not Implemented |
AM0165 # 01 Y:1992 | 01 | 1992 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $23,570 | $1,350 | Implemented |
AM0165 # 02 Y:1992 | 02 | 1992 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $6,300 | $3,630 | Implemented |
AM0165 # 03 Y:1992 | 03 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,915 | $3,450 | Not Implemented |
AM0165 # 04 Y:1992 | 04 | 1992 | REDUCE FLUID FLOW RATES | $2,710 | $0 | Not Implemented |
AM0165 # 05 Y:1992 | 05 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,750 | $0 | Not Implemented |
AM0165 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,330 | $2,520 | Implemented |
AM0165 # 07 Y:1992 | 07 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $920 | $920 | Not Implemented |
AM0165 # 08 Y:1992 | 08 | 1992 | INSTALL SET-BACK TIMERS | $150 | $190 | Implemented |
AM0163 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $18,300 | $35,000 | Implemented |
AM0163 # 02 Y:1992 | 02 | 1992 | REPAIR AND ELIMINATE STEAM LEAKS | $2,440 | $1,240 | Implemented |
AM0163 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,420 | $1,360 | Not Implemented |