IAC logo
IAC Assessment: AM0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1994
Principal Product Heat exchanger and hydraulic fin tubing
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 61,000
Annual Production 2,510,000 Thousand Feet
Production Hrs. Annual 6,288
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,695 977,140 kWh $0.08
Natural Gas $28,371 5,009 MMBtu $5.66
TOTAL ENERGY COSTS $111,066
RECOMMENDED SAVINGS* $55,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Primary Raw Material Electricity Usage Administrative Changes Primary Raw Material
$ kWh $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$34,600
Cost:
-
- - - - $34,600 - -
-
kWh
-
-
$
$34,600
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,090
Cost:
$600
- - - - $1,090 - -
-
kWh
-
-
$
$1,090
-
$
03: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$6,600
Cost:
$700
$6,600 134,818 - - - - $6,600
134,818
kWh
-
-
$
-
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$5,400
Cost:
-
- - $5,400 - - - -
-
kWh
$5,400
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,990
Cost:
$4,300
- - $3,990 - - - -
-
kWh
$3,990
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,150
Cost:
-
- - $2,150 - - - -
-
kWh
$2,150
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$700
Cost:
$1,220
$700 10,258 - - - - $700
10,258
kWh
-
-
$
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$640
Cost:
-
$640 - - - - - $640
-
kWh
-
-
$
-
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$230
Cost:
$80
$230 2,931 - - - - $230
2,931
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,400
Cost:
$6,900
$8,170 148,007 $11,540 - $35,690 - $8,170
148,007
kWh
$11,540
-
$
$35,690
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Administrative Changes Primary Raw Material Electricity Usage Administrative Changes Primary Raw Material