IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,632

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0901 # 05 Y:2017 05 2017 USE SOLAR HEAT FOR HEAT $52,084 $187,502 Not Implemented
GT0900 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,820 $250 Implemented
GT0900 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,671 $250 Implemented
GT0900 # 03 Y:2017 03 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,890 $180 Implemented
GT0900 # 04 Y:2017 04 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $42,468 $8,000 Not Implemented
GT0900 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,980 $127,113 Implemented
GT0900 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $16,527 $106,785 Not Implemented
GT0899 # 01 Y:2017 01 2017 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $108,707 $1,008 Not Implemented
GT0899 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,187 $1,000 Implemented
GT0899 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,097 $4,967 Implemented
GT0899 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,882 $10,400 Not Implemented
GT0899 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $8,883 $9,708 Implemented
GT0899 # 06 Y:2017 06 2017 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $205,713 $445,437 Not Implemented
GT0898 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,203 $150 Not Implemented
GT0898 # 02 Y:2017 02 2017 METER WASTE WATER $38,607 $18,000 Implemented
GT0898 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,648 $9,390 Implemented
GT0898 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,223 $8,011 Not Implemented
GT0898 # 05 Y:2017 05 2017 USE SOLAR HEAT FOR HEAT $42,901 $150,153 Not Implemented
GT0897 # 05 Y:2017 05 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,351 $15,070 Implemented
GT0897 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,875 $15,743 Implemented
GT0897 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $2,357 $1,400 Not Implemented
GT0897 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $499 $607 Implemented
GT0897 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,189 $1,673 Not Implemented
GT0897 # 04 Y:2017 04 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,316 $19,418 Implemented
GT0896 # 01 Y:2017 01 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,852 $90,000 Not Implemented