IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0131 # 05 Y:1994 05 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,182 $6,400 Implemented
AS0131 # 06 Y:1994 06 1994 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,803 $990 Implemented
AS0131 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $247 $355 Not Implemented
IA0096 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,198 $350 Implemented
IA0096 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,811 $365 Not Implemented
IA0096 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,098 $25 Not Implemented
IA0096 # 04 Y:1994 04 1994 COVER OPEN TANKS $1,597 $3,050 Not Implemented
IA0096 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,971 $0 Not Implemented
IA0096 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,536 $7,244 Implemented
IA0096 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $522 $771 Not Implemented
IA0096 # 08 Y:1994 08 1994 INSTALL OCCUPANCY SENSORS $448 $1,067 Implemented
MA0319 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,463 $10,240 Not Implemented
MA0319 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $5,357 $12,000 Implemented
MA0319 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $4,412 $10,920 Not Implemented
MA0319 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $2,218 $555 Not Implemented
MA0319 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $919 $3,119 Not Implemented
MA0319 # 06 Y:1994 06 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,125 $2,197 Not Implemented
NC0040 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $659 $480 Implemented
NC0040 # 02 Y:1994 02 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,912 $1,600 Not Implemented
NC0040 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $723 $360 Implemented
NC0040 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,044 $3,000 Not Implemented
NC0040 # 05 Y:1994 05 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,722 $0 Not Implemented
NC0040 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $807 $1,190 Implemented
ND0194 # 01 Y:1994 01 1994 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $32,960 $32,960 Not Implemented
ND0194 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,523 $21,380 Implemented