Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,474
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0131 # 05 Y:1994 | 05 | 1994 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,182 | $6,400 | Implemented |
AS0131 # 06 Y:1994 | 06 | 1994 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,803 | $990 | Implemented |
AS0131 # 07 Y:1994 | 07 | 1994 | INSULATE BARE EQUIPMENT | $247 | $355 | Not Implemented |
IA0096 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,198 | $350 | Implemented |
IA0096 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,811 | $365 | Not Implemented |
IA0096 # 03 Y:1994 | 03 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,098 | $25 | Not Implemented |
IA0096 # 04 Y:1994 | 04 | 1994 | COVER OPEN TANKS | $1,597 | $3,050 | Not Implemented |
IA0096 # 05 Y:1994 | 05 | 1994 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,971 | $0 | Not Implemented |
IA0096 # 06 Y:1994 | 06 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,536 | $7,244 | Implemented |
IA0096 # 07 Y:1994 | 07 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $522 | $771 | Not Implemented |
IA0096 # 08 Y:1994 | 08 | 1994 | INSTALL OCCUPANCY SENSORS | $448 | $1,067 | Implemented |
MA0319 # 01 Y:1994 | 01 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,463 | $10,240 | Not Implemented |
MA0319 # 02 Y:1994 | 02 | 1994 | OPTIMIZE PLANT POWER FACTOR | $5,357 | $12,000 | Implemented |
MA0319 # 03 Y:1994 | 03 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,412 | $10,920 | Not Implemented |
MA0319 # 04 Y:1994 | 04 | 1994 | USE SYNTHETIC LUBRICANT | $2,218 | $555 | Not Implemented |
MA0319 # 05 Y:1994 | 05 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $919 | $3,119 | Not Implemented |
MA0319 # 06 Y:1994 | 06 | 1994 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,125 | $2,197 | Not Implemented |
NC0040 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $659 | $480 | Implemented |
NC0040 # 02 Y:1994 | 02 | 1994 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,912 | $1,600 | Not Implemented |
NC0040 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $723 | $360 | Implemented |
NC0040 # 04 Y:1994 | 04 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,044 | $3,000 | Not Implemented |
NC0040 # 05 Y:1994 | 05 | 1994 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,722 | $0 | Not Implemented |
NC0040 # 06 Y:1994 | 06 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $807 | $1,190 | Implemented |
ND0194 # 01 Y:1994 | 01 | 1994 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $32,960 | $32,960 | Not Implemented |
ND0194 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,523 | $21,380 | Implemented |