Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0487 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,490 | $6,000 | Implemented |
IA0487 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,650 | $35 | Implemented |
LE0349 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,018 | $7,190 | Implemented |
LE0349 # 02 Y:2012 | 02 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $85,383 | $310,000 | Implemented |
LE0349 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,249 | $40 | Not Implemented |
LE0349 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,253 | $1,248 | Not Implemented |
LE0349 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,373 | $1,080 | Implemented |
LE0349 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,052 | $200 | Implemented |
LE0349 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,510 | $12,700 | Not Implemented |
LE0349 # 08 Y:2012 | 08 | 2012 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,074 | $5,200 | Not Implemented |
OR0594 # 01 Y:2012 | 01 | 2012 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $393,360 | $20,880 | Not Implemented |
OR0594 # 02 Y:2012 | 02 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $163,282 | $119,416 | Not Implemented |
OR0594 # 03 Y:2012 | 03 | 2012 | Install Anaerobic Digester | $1,369,423 | $3,468,069 | Implemented |
OR0594 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,684 | $7,360 | Implemented |
OR0594 # 05 Y:2012 | 05 | 2012 | INSTALL AUTOMATIC STACK DAMPER | $3,989 | $5,325 | Not Implemented |
OR0594 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $2,867 | $2,708 | Not Implemented |
IP0004 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,520 | $0 | Implemented |
IP0004 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,343 | $0 | Implemented |
IP0004 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,110 | $0 | Implemented |
IP0004 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $21,686 | $18,150 | Implemented |
IP0004 # 05 Y:2012 | 05 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,462 | $15,867 | Not Implemented |
IP0004 # 06 Y:2012 | 06 | 2012 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $10,500 | $27,000 | Not Implemented |
LE0350 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,189 | $3,025 | Not Implemented |
LE0350 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $5,254 | $9,913 | Not Implemented |
LE0350 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,486 | $11,638 | Not Implemented |