IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0489 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $411 n/a
BD0489 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $578 $400 n/a
BD0489 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $270 $800 n/a
BD0489 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $196 $400 n/a
UK1607 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $53,387 $292,000 Not Implemented
UK1607 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,600 $41,160 Implemented
UK1607 # 03 Y:2016 03 2016 UPGRADE OBSOLETE EQUIPMENT $19,747 $4,240 Implemented
UK1607 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $1,775 Implemented
AM0715 # 01 Y:2016 01 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $566,490 $1,145,213 Not Implemented
AM0715 # 02 Y:2016 02 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $53,960 $0 Not Implemented
AM0715 # 03 Y:2016 03 2016 USE SOLAR HEAT FOR HEAT $31,594 $151,288 Implemented
AM0715 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,530 $50,830 Implemented
AM0715 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,750 $50 Implemented
AM0715 # 06 Y:2016 06 2016 USE OPTIMUM TEMPERATURE $8,060 $9,230 Not Implemented
AM0715 # 07 Y:2016 07 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,830 $4,560 Implemented
AM0715 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $0 Implemented
TT0178 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,653 $3,050 Not Implemented
TT0178 # 02 Y:2016 02 2016 APPLY FOR INVESTMENT INCENTIVES $4,193 $40 Implemented
TT0178 # 03 Y:2016 03 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,598 $530 Not Implemented
TT0178 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $805 $250 Not Implemented
TT0178 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $332 $125 Not Implemented
TT0178 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $329 $600 Not Implemented
UM0473 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $6,129 $15,000 n/a
UM0473 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,050 $1,000 n/a
UM0473 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,566 $1,000 n/a