IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0990 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $2,774 $10,470 Not Implemented
UD0990 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,379 $200,263 Not Implemented
SU0464 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,408 $1,206 Not Implemented
SU0464 # 02 Y:2018 02 2018 INSULATE FEEDWATER TANK $637 $386 Implemented
SU0464 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,546 $73,000 Implemented
SU0464 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $740 Implemented
SU0464 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $780 Implemented
SU0464 # 06 Y:2018 06 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $208 $422 Not Implemented
SU0464 # 07 Y:2018 07 2018 RECOVER WASTE HEAT FROM EQUIPMENT $93,805 $187,500 Implemented
SU0464 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $233 $537 Not Implemented
GT0916 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,228 $263 Implemented
GT0916 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $5,518 $200 Not Implemented
GT0916 # 03 Y:2018 03 2018 USE OPTIMUM TEMPERATURE $29,211 $1,600 Not Implemented
GT0916 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $55,747 $3,800 Implemented
GT0916 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $41,023 $3,991 Not Implemented
GT0916 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $12,211 $1,242 Not Implemented
GT0916 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,215 $10,400 Implemented
GT0916 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,406 $38,834 Implemented
GT0916 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,820 $207,295 Not Implemented
AM0760 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,161 $43,708 Implemented
AM0760 # 02 Y:2018 02 2018 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,500 $300 Implemented
AM0760 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,298 $1,000 Implemented
AM0760 # 04 Y:2018 04 2018 PAY UTILITY BILLS ON TIME $1,351 $0 Implemented
AM0760 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,121 $2,000 Not Implemented
AM0760 # 06 Y:2018 06 2018 USE PHOTOCELL CONTROLS $823 $963 Implemented