Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0990 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,774 | $10,470 | Not Implemented |
UD0990 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,379 | $200,263 | Not Implemented |
SU0464 # 01 Y:2018 | 01 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,408 | $1,206 | Not Implemented |
SU0464 # 02 Y:2018 | 02 | 2018 | INSULATE FEEDWATER TANK | $637 | $386 | Implemented |
SU0464 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,546 | $73,000 | Implemented |
SU0464 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $500 | $740 | Implemented |
SU0464 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $400 | $780 | Implemented |
SU0464 # 06 Y:2018 | 06 | 2018 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $208 | $422 | Not Implemented |
SU0464 # 07 Y:2018 | 07 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $93,805 | $187,500 | Implemented |
SU0464 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $233 | $537 | Not Implemented |
GT0916 # 01 Y:2018 | 01 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,228 | $263 | Implemented |
GT0916 # 02 Y:2018 | 02 | 2018 | AIR CONDITION ONLY SPACE NECESSARY | $5,518 | $200 | Not Implemented |
GT0916 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM TEMPERATURE | $29,211 | $1,600 | Not Implemented |
GT0916 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $55,747 | $3,800 | Implemented |
GT0916 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $41,023 | $3,991 | Not Implemented |
GT0916 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $12,211 | $1,242 | Not Implemented |
GT0916 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,215 | $10,400 | Implemented |
GT0916 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,406 | $38,834 | Implemented |
GT0916 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,820 | $207,295 | Not Implemented |
AM0760 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,161 | $43,708 | Implemented |
AM0760 # 02 Y:2018 | 02 | 2018 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,500 | $300 | Implemented |
AM0760 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,298 | $1,000 | Implemented |
AM0760 # 04 Y:2018 | 04 | 2018 | PAY UTILITY BILLS ON TIME | $1,351 | $0 | Implemented |
AM0760 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,121 | $2,000 | Not Implemented |
AM0760 # 06 Y:2018 | 06 | 2018 | USE PHOTOCELL CONTROLS | $823 | $963 | Implemented |