Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,406
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0457 # 04 Y:2018 | 04 | 2018 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $4,539 | $2,530 | Not Implemented |
AS0457 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,412 | $2,750 | Not Implemented |
AS0457 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,736 | $7,600 | Not Implemented |
AS0457 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,832 | $676 | Implemented |
AS0456 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,722 | $320 | Implemented |
AS0456 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,727 | $13,500 | Not Implemented |
AS0456 # 03 Y:2018 | 03 | 2018 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $46,649 | $220,160 | Not Implemented |
AS0456 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $30,900 | $16,614 | Not Implemented |
AS0456 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,670 | $51,257 | Not Implemented |
AS0456 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $82,206 | $176,400 | Implemented |
AS0456 # 07 Y:2018 | 07 | 2018 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $24,546 | $0 | Not Implemented |
AS0455 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,307 | $180 | Implemented |
AS0455 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,768 | $800 | Not Implemented |
AS0455 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,097 | $36,012 | Implemented |
AS0455 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,551 | $12,598 | Implemented |
AS0455 # 05 Y:2018 | 05 | 2018 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $114,480 | $30,000 | Implemented |
AS0455 # 06 Y:2018 | 06 | 2018 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $1,556 | $0 | Not Implemented |
AS0455 # 07 Y:2018 | 07 | 2018 | PAY BILLS ON TIME TO AVOID LATE FEES | $15,576 | $0 | Not Implemented |
AS0454 # 01 Y:2018 | 01 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $274,952 | $196,499 | Not Implemented |
AS0454 # 02 Y:2018 | 02 | 2018 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $64,677 | $0 | Not Implemented |
AS0454 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,697 | $12,185 | Not Implemented |
AS0454 # 04 Y:2018 | 04 | 2018 | USE LESS WASTEFUL PACKAGING | $12,596 | $196 | Not Implemented |
AS0454 # 05 Y:2018 | 05 | 2018 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $11,530 | $150 | Not Implemented |
AS0454 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $4,026 | $3,043 | Not Implemented |
AS0453 # 01 Y:2018 | 01 | 2018 | INSTALL SET-BACK TIMERS | $7,726 | $83 | Not Implemented |