IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,175

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0327 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,690 $4,300 Not Implemented
GT0327 # 06 Y:1987 06 1987 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $15,020 $54,424 Not Implemented
KU0232 # 01 Y:1987 01 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $1,464 $0 Implemented
KU0232 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $576 $366 Not Implemented
KU0232 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $572 $100 Implemented
KU0232 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $170 $0 Implemented
KU0232 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $158 $40 Implemented
KU0232 # 06 Y:1987 06 1987 IMPROVE LUBRICATION PRACTICES $134 $0 Not Implemented
KU0233 # 01 Y:1987 01 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,808 $5,500 Not Implemented
KU0233 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,637 $2,246 Implemented
KU0233 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $1,038 $0 Not Implemented
KU0233 # 04 Y:1987 04 1987 INSTALL AUTOMATIC STACK DAMPER $678 $400 Not Implemented
KU0233 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $424 $0 Implemented
KU0233 # 06 Y:1987 06 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $369 $0 Implemented
KU0234 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,784 $3,862 Implemented
KU0234 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,993 $8,000 Not Implemented
KU0234 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $5,345 $4,000 Implemented
KU0234 # 04 Y:1987 04 1987 INSTALL TURBULATORS $4,336 $6,311 Not Implemented
KU0234 # 05 Y:1987 05 1987 IMPROVE LUBRICATION PRACTICES $4,229 $0 Not Implemented
KU0234 # 06 Y:1987 06 1987 INSULATE BARE EQUIPMENT $3,013 $5,000 Implemented
KU0234 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,044 $0 Implemented
KU0234 # 08 Y:1987 08 1987 REPAIR AND ELIMINATE STEAM LEAKS $1,504 $140 Implemented
KU0234 # 09 Y:1987 09 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,385 $0 Implemented
KU0234 # 10 Y:1987 10 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $544 $400 Implemented
KU0230 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,144 $615 Implemented