IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0531 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,192 $300 Implemented
UD0531 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $611 $2,000 Implemented
UD0531 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,444 $12,327 Implemented
AR0127 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,218 $202 Not Implemented
AR0127 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65 $900 Implemented
AR0127 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $133 $0 Implemented
AR0127 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $604 $160 Not Implemented
AR0127 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $4,426 $600 Implemented
AR0127 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,530 $200 Implemented
AR0127 # 07 Y:1997 07 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,019 $0 Implemented
AR0127 # 08 Y:1997 08 1997 RECOVER AND REUSE COOLING WATER $2,296 $4,200 Not Implemented
AR0127 # 09 Y:1997 09 1997 $11,155 $4,500 Not Implemented
AS0213 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $286 $450 Not Implemented
AS0213 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $287 $300 Not Implemented
AS0213 # 03 Y:1997 03 1997 DISCONNECT BALLASTS $277 $15 Not Implemented
AS0213 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $122 $348 Not Implemented
AS0213 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,357 $3,800 Not Implemented
AS0213 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,642 $1,827 Not Implemented
AS0213 # 07 Y:1997 07 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $1,813 $5,185 Not Implemented
AS0213 # 08 Y:1997 08 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,674 $60 Not Implemented
AS0213 # 09 Y:1997 09 1997 $1,487 $1,020 Not Implemented
AS0213 # 10 Y:1997 10 1997 $1,365,942 $500,000 Not Implemented
KU0481 # 01 Y:1997 01 1997 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $30,340 $21,800 Not Implemented
KU0481 # 02 Y:1997 02 1997 INSULATE BARE EQUIPMENT $24,670 $27,000 Implemented
KU0481 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,190 $25,840 Implemented