IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0616 # 01 Y:2001 01 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $447 $2,790 Not Implemented
OK0616 # 02 Y:2001 02 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,570 $1,040 Implemented
OK0616 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,387 $4,428 Implemented
OK0616 # 04 Y:2001 04 2001 INSTALL COMMON HEADER ON COMPRESSORS $11,108 $7,010 Not Implemented
OK0616 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,001 $25,778 n/a
OK0616 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,349 $21,884 Not Implemented
OK0616 # 07 Y:2001 07 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,930,557 $208,000 n/a
OK0616 # 08 Y:2001 08 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $13,739 $3,900 Not Implemented
OK0616 # 09 Y:2001 09 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $135,553 $58,580 n/a
OK0616 # 10 Y:2001 10 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $540,000 $125,040 Implemented
SU0122 # 01 Y:2001 01 2001 USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING $18,489 $0 Not Implemented
SU0122 # 02 Y:2001 02 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,468 $0 Not Implemented
SU0122 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $486 $0 Not Implemented
SU0122 # 04 Y:2001 04 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $15,879 $0 Not Implemented
SU0122 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $38 $0 Not Implemented
NC0225 # 01 Y:2001 01 2001 DEVELOP A REPAIR/REPLACE POLICY $2,783 $1,895 Implemented
NC0225 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,625 $33,848 Implemented
NC0225 # 03 Y:2001 03 2001 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $27,745 $33,990 n/a
NC0225 # 04 Y:2001 04 2001 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $15,365 $5,000 Implemented
NC0225 # 05 Y:2001 05 2001 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $20,000 $40,000 n/a
NC0225 # 06 Y:2001 06 2001 KEEP BOILER TUBES CLEAN $3,649 $13,000 Implemented
NC0225 # 07 Y:2001 07 2001 REPAIR AND ELIMINATE STEAM LEAKS $8,655 $3,500 Implemented
NC0225 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,105 $100,000 Implemented
MA0493 # 01 Y:2001 01 2001 ADOPT IN-HOUSE MATERIAL GENERATION $48,702 $180,000 Not Implemented
MA0493 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,846 $0 Implemented