IAC Assessment: NC0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2001
Principal Product Dyed woven fabrics
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 750,000
Annual Production 750,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $523,100 5,587,630 kWh $0.09
Electricity Demand $382,459 40,800 kW-months/year $9.37
Electricity Fees $9,657 - $ -
Natural Gas $1,969,268 270,951 MMBtu $7.27
Coal $1,000,000 487,805 MMBtu $2.05
TOTAL ENERGY COSTS $3,884,484
RECOMMENDED SAVINGS* $121,927 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,182
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Coal Administrative Changes Primary Product Electricity Usage Electricity Demand Coal Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,783
Cost:
$1,895
$1,649 60,189 $1,134 120 - - - - - - $1,649
60,189
kWh
$1,134
120
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,625
Cost:
$33,848
$9,259 337,914 $6,366 676 - - - - - - $9,259
337,914
kWh
$6,366
676
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$27,745
Cost:
$33,990
$6,028 220,000 $6,217 660 - - $10,000 - $5,500 - $6,028
220,000
kWh
$6,217
660
kW-months/year
-
-
MMBtu
$10,000
-
$
$5,500
-
$
04: 2.1115 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS Savings:
$15,365
Cost:
$5,000
- - - - $15,365 7,495 - - - - -
-
kWh
-
-
kW-months/year
$15,365
7,495
MMBtu
-
-
$
-
-
$
05: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$20,000
Cost:
$40,000
$964 35,200 $668 71 $18,368 8,960 - - - - $964
35,200
kWh
$668
71
kW-months/year
$18,368
8,960
MMBtu
-
-
$
-
-
$
06: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$3,649
Cost:
$13,000
- - - - $3,649 1,780 - - - - -
-
kWh
-
-
kW-months/year
$3,649
1,780
MMBtu
-
-
$
-
-
$
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,655
Cost:
$3,500
- - - - $8,655 4,222 - - - - -
-
kWh
-
-
kW-months/year
$8,655
4,222
MMBtu
-
-
$
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$28,105
Cost:
$100,000
- - - - $28,105 13,710 - - - - -
-
kWh
-
-
kW-months/year
$28,105
13,710
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$121,927
Cost:
$231,233
$17,900 653,303 $14,385 1,527 $74,142 36,167 $10,000 - $5,500 - $17,900
653,303
kWh
$14,385
1,527
kW-months/year
$74,142
36,167
MMBtu
$10,000
-
$
$5,500
-
$
TOTAL IMPLEMENTED Savings:
$74,182
Cost:
$157,243
$10,908 398,103 $7,500 796 $55,774 27,207 - - - - $10,908
398,103
kWh
$7,500
796
kW-months/year
$55,774
27,207
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Coal Administrative Changes Primary Product Electricity Usage Electricity Demand Coal Administrative Changes Primary Product