IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0406 # 02 Y:2010 02 2010 TREAT AND REUSE RINSE WATERS $51,487 $8,875 Not Implemented
NC0406 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,177 $50 Implemented
NC0406 # 04 Y:2010 04 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,743 $50,000 Implemented
NC0406 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,835 $100 Implemented
NC0406 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,210 $15,045 Not Implemented
NC0406 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,747 $8,000 Not Implemented
NC0406 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $508 $920 Implemented
NC0406 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,958 $3,256 Implemented
NC0406 # 10 Y:2010 10 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $276,388 $214,700 Implemented
NC0406 # 11 Y:2010 11 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,625 $50,000 Implemented
WV0414 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $22,889 $18,300 Not Implemented
WV0414 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,304 $42,420 Implemented
WV0414 # 03 Y:2010 03 2010 REDUCE FLUID FLOW RATES $7,185 $280 Implemented
WV0414 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,064 $15,400 Not Implemented
WV0414 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,414 $400 Not Implemented
WV0414 # 06 Y:2010 06 2010 USE RADIANT HEATER FOR SPOT HEATING $3,403 $5,310 Not Implemented
WV0414 # 07 Y:2010 07 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,505 $14,000 Not Implemented
WV0414 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $3,614 Implemented
WV0414 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,409 $835 Not Implemented
WV0414 # 10 Y:2010 10 2010 RECOVER MECHANICAL ENERGY $1,362 $1,000 Implemented
WV0414 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,335 $1,070 Implemented
WV0414 # 12 Y:2010 12 2010 DEVELOP A REPAIR/REPLACE POLICY $1,318 $740 Implemented
WV0414 # 13 Y:2010 13 2010 IMPROVE LUBRICATION PRACTICES $413 $465 Not Implemented
WV0414 # 14 Y:2010 14 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $388 $1,735 Implemented
UM0373 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,156 $44,196 Not Implemented