IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0264 # 04 Y:1988 04 1988 INSTALL STORM WINDOWS AND DOORS $984 $929 Implemented
UD0265 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,041 $0 Implemented
UD0265 # 02 Y:1988 02 1988 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $1,837 $6,300 Implemented
UD0265 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $309 $528 Not Implemented
UD0260 # 01 Y:1988 01 1988 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,647 $500 Implemented
UD0260 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,125 $0 Not Implemented
UD0260 # 03 Y:1988 03 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,025 $2,000 Implemented
UD0260 # 04 Y:1988 04 1988 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $1,447 $0 Implemented
UD0260 # 05 Y:1988 05 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,399 $180 Implemented
UD0260 # 06 Y:1988 06 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,469 $200 Not Implemented
UD0263 # 01 Y:1988 01 1988 OPTIMIZE PLANT POWER FACTOR $4,019 $15,000 Implemented
UD0263 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,000 $0 Not Implemented
UD0263 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,423 $1,000 Implemented
UD0263 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,534 $0 Not Implemented
UD0263 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,981 $1,500 Implemented
UD0263 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,295 $9,000 Implemented
UD0257 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $2,800 Implemented
UD0257 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $621 $3,000 Not Implemented
UD0257 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $1,000 Implemented
UD0257 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $4,290 $7,000 Not Implemented
UD0257 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $20,153 $80,000 Not Implemented
UD0258 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,392 $0 Not Implemented
UD0258 # 02 Y:1988 02 1988 KEEP LAMPS AND REFLECTORS CLEAN $4,256 $9,120 Not Implemented
UD0258 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,481 $12,297 Not Implemented
UD0259 # 01 Y:1988 01 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $182 $0 Implemented