IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0076 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $23,000 $64,000 Implemented
AM0076 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,100 $2,000 Implemented
AM0076 # 03 Y:1990 03 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,940 $3,614 Implemented
AM0076 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $240 $180 Not Implemented
AM0076 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $127 $199 Implemented
AM0077 # 01 Y:1990 01 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,200 $51,900 Implemented
AM0077 # 02 Y:1990 02 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,385 $12,000 Implemented
AM0077 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,660 $1,500 Implemented
AM0077 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $910 $0 Implemented
AM0077 # 05 Y:1990 05 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $440 $0 Implemented
AM0077 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34 $31 Implemented
AM0078 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,600 $0 Implemented
AM0078 # 02 Y:1990 02 1990 IMPROVE LUBRICATION PRACTICES $2,010 $0 Not Implemented
AM0078 # 03 Y:1990 03 1990 ISOLATE HOT OR COLD EQUIPMENT $1,090 $500 Implemented
AM0078 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $810 $550 Implemented
AM0079 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,390 $2,000 Implemented
AM0079 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,990 $26,637 Implemented
AM0079 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,440 $2,000 Implemented
AM0079 # 04 Y:1990 04 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,670 $4,050 Implemented
AM0079 # 05 Y:1990 05 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $470 $0 Implemented
AM0079 # 06 Y:1990 06 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $340 $0 Implemented
AM0079 # 07 Y:1990 07 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $255 $90 Implemented
AM0079 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46 $17 Implemented
AM0075 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,170 $28,650 Not Implemented
AM0075 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,222 $1,200 Implemented