IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0005 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $24,677 $10,000 Not Implemented
DL0005 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,314 $108,987 Implemented
DL0005 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,951 $80,000 Not Implemented
DL0004 # 01 Y:2007 01 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $39,666 $0 Implemented
DL0004 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,000 $97,570 Not Implemented
DL0004 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $800 Not Implemented
DL0004 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,933 $500 Not Implemented
DL0004 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,506 $33,000 Not Implemented
DL0004 # 06 Y:2007 06 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $93,700 $130,000 Not Implemented
DL0004 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,203 $8,830 Not Implemented
DL0001 # 01 Y:2007 01 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $93,802 $111,140 Not Implemented
DL0001 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,151 $13,790 Implemented
DL0001 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,111 $104,392 Implemented
DL0001 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $44,733 $12,474 Not Implemented
DL0001 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,582 $620 Not Implemented
DL0001 # 06 Y:2007 06 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $29,521 $0 Not Implemented
DL0001 # 07 Y:2007 07 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,976 $5,832 Not Implemented
LE0243 # 01 Y:2006 01 2006 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $193,808 $200,000 Not Implemented
LE0243 # 02 Y:2006 02 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,291 $86,000 Not Implemented
LE0243 # 03 Y:2006 03 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $27,533 $20,000 Not Implemented
LE0243 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $27,306 $200 Not Implemented
LE0243 # 05 Y:2006 05 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $18,286 $50,000 Not Implemented
LE0243 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $8,730 $2,400 Not Implemented
LE0243 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,824 $80 Not Implemented
LE0243 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,925 $2,000 Not Implemented