IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0292 # 03 Y:1989 03 1989 RECOVER WASTE HEAT FROM EQUIPMENT $6,776 $12,000 Implemented
OK0293 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $803 $671 Implemented
OK0293 # 02 Y:1989 02 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $155 $208 Not Implemented
OK0293 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,624 $1,500 Implemented
OK0293 # 04 Y:1989 04 1989 REPAIR OR REPLACE STEAM TRAPS $6,091 $7,500 Implemented
OK0293 # 05 Y:1989 05 1989 USE OPTIMUM THICKNESS INSULATION $959 $1,320 Not Implemented
OK0293 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $104 $222 Implemented
OK0294 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,730 $818 Implemented
OK0294 # 02 Y:1989 02 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,202 $7,214 Implemented
OK0294 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,053 $8,840 Implemented
OK0294 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $555 $1,500 Implemented
OK0294 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $277 $229 Implemented
OK0294 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $7,140 Implemented
OR0058 # 01 Y:1989 01 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $8,281 $0 Implemented
OR0058 # 02 Y:1989 02 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,976 $200 Implemented
OR0058 # 03 Y:1989 03 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,940 $200 Not Implemented
OR0058 # 04 Y:1989 04 1989 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,914 $200 Implemented
OR0058 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $519 $250 Not Implemented
OR0058 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $283 $172 Not Implemented
OR0058 # 07 Y:1989 07 1989 COVER OPEN TANKS $1,428 $0 Implemented
OR0058 # 08 Y:1989 08 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $847 $1,170 Implemented
OR0059 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,485 $500 Implemented
OR0059 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,970 $5,000 Implemented
OR0059 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,110 $826 Implemented
OR0059 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,348 $1,893 Implemented