IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0566 # 02 Y:1995 02 1995 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $81,900 $80,000 Implemented
GT0566 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $795 $1,170 Implemented
GT0566 # 04 Y:1995 04 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,700 $0 Not Implemented
GT0566 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,360 $6,048 Not Implemented
GT0566 # 06 Y:1995 06 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $2,940 $3,560 Implemented
GT0566 # 07 Y:1995 07 1995 MINIMIZE WATER USAGE $123 $324 Implemented
UM0043 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,000 $40 Implemented
UM0043 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,241 $11,641 Not Implemented
UM0043 # 03 Y:1995 03 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,062 $2,500 Not Implemented
SF0073 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $760 $2,712 Implemented
SF0073 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,344 $77,930 Implemented
SF0073 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $216 $360 Implemented
SF0073 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,574 $6,500 Implemented
SF0073 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,035 $3,560 Not Implemented
SF0073 # 06 Y:1995 06 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,080 $2,950 Not Implemented
SF0073 # 07 Y:1995 07 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $2,735 $1,768 Not Implemented
SF0073 # 08 Y:1995 08 1995 OPTIMIZE PLANT POWER FACTOR $2,095 $2,297 Not Implemented
SF0073 # 09 Y:1995 09 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,400 $0 Implemented
SF0073 # 10 Y:1995 10 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $25,718 $644 Not Implemented
UF0125 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,471 $0 Not Implemented
UF0125 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $71 Implemented
UF0125 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $360 Not Implemented
UF0125 # 04 Y:1995 04 1995 REDESIGN PROCESS $14,920 $19,775 Not Implemented
UF0125 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $307 $966 Implemented
UF0125 # 06 Y:1995 06 1995 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $114 $250 Implemented