Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0493 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,613 | $150 | Implemented |
MA0493 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,165 | $3,750 | Not Implemented |
MA0493 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $516 | $1,000 | Implemented |
MA0493 # 06 Y:2001 | 06 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $161 | $100 | Implemented |
MA0493 # 07 Y:2001 | 07 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $350 | $0 | Implemented |
MI0021 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $13,904 | $3,650 | Not Implemented |
MI0021 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,770 | $312 | Implemented |
MI0021 # 03 Y:2001 | 03 | 2001 | MODIFY STARTUP/SHUTDOWN TIMES | $3,634 | $113 | Not Implemented |
MI0021 # 04 Y:2001 | 04 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,275 | $7 | Not Implemented |
MI0021 # 05 Y:2001 | 05 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,250 | $4,200 | Implemented |
LE0123 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,468 | $2,500 | Implemented |
LE0123 # 02 Y:2001 | 02 | 2001 | INSULATE FEEDWATER TANK | $14,924 | $380 | Not Implemented |
LE0123 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $57,598 | $6,000 | Implemented |
LE0123 # 04 Y:2001 | 04 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $13,548 | $0 | Implemented |
LE0123 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,354 | $1,280 | Not Implemented |
LE0123 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,880 | $0 | Not Implemented |
OK0621 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,536 | $13,800 | Implemented |
OK0621 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,000 | $300 | Implemented |
OK0621 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,550 | $1,185 | Implemented |
OK0621 # 04 Y:2001 | 04 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $50,500 | $25,810 | Implemented |
OK0621 # 05 Y:2001 | 05 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $47,308 | $16,792 | Not Implemented |
WI0407 # 01 Y:2001 | 01 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $26,600 | $0 | n/a |
WI0407 # 02 Y:2001 | 02 | 2001 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $6,632 | $12,000 | n/a |
WI0407 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,562 | $100 | n/a |
WI0407 # 04 Y:2001 | 04 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,796 | $3,760 | n/a |