IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0493 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,613 $150 Implemented
MA0493 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $2,165 $3,750 Not Implemented
MA0493 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $516 $1,000 Implemented
MA0493 # 06 Y:2001 06 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $161 $100 Implemented
MA0493 # 07 Y:2001 07 2001 PAY BILLS ON TIME TO AVOID LATE FEES $350 $0 Implemented
MI0021 # 01 Y:2001 01 2001 METER WASTE WATER $13,904 $3,650 Not Implemented
MI0021 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,770 $312 Implemented
MI0021 # 03 Y:2001 03 2001 MODIFY STARTUP/SHUTDOWN TIMES $3,634 $113 Not Implemented
MI0021 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,275 $7 Not Implemented
MI0021 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,250 $4,200 Implemented
LE0123 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,468 $2,500 Implemented
LE0123 # 02 Y:2001 02 2001 INSULATE FEEDWATER TANK $14,924 $380 Not Implemented
LE0123 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $57,598 $6,000 Implemented
LE0123 # 04 Y:2001 04 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $13,548 $0 Implemented
LE0123 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,354 $1,280 Not Implemented
LE0123 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,880 $0 Not Implemented
OK0621 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,536 $13,800 Implemented
OK0621 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,000 $300 Implemented
OK0621 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,550 $1,185 Implemented
OK0621 # 04 Y:2001 04 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $50,500 $25,810 Implemented
OK0621 # 05 Y:2001 05 2001 IMPROVE SPACE COMFORT CONDITIONING $47,308 $16,792 Not Implemented
WI0407 # 01 Y:2001 01 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $26,600 $0 n/a
WI0407 # 02 Y:2001 02 2001 DISTILL CONTAMINATED SOLVENTS FOR REUSE $6,632 $12,000 n/a
WI0407 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $4,562 $100 n/a
WI0407 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,796 $3,760 n/a