Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0514 # 04 Y:2002 | 04 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $200 | $0 | Not Implemented |
CO0514 # 05 Y:2002 | 05 | 2002 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $18,470 | $30,800 | Not Implemented |
OR0418 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,409 | $1,400 | Implemented |
OR0418 # 02 Y:2002 | 02 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $6,865 | $7,600 | Implemented |
OR0418 # 03 Y:2002 | 03 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,090 | $1,800 | Implemented |
OR0418 # 04 Y:2002 | 04 | 2002 | OPTIMIZE PLANT POWER FACTOR | $929 | $1,500 | Implemented |
OR0418 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,707 | $9,446 | Implemented |
OR0422 # 01 Y:2002 | 01 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,067 | $0 | Implemented |
OR0422 # 02 Y:2002 | 02 | 2002 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $4,106 | $2,000 | Implemented |
OR0422 # 03 Y:2002 | 03 | 2002 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $6,975 | $5,500 | Implemented |
OR0422 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,944 | $2,953 | Implemented |
OR0422 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $595 | $0 | Implemented |
OR0421 # 01 Y:2002 | 01 | 2002 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $31,000 | $12,000 | Implemented |
OR0421 # 02 Y:2002 | 02 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $27,311 | $32,500 | Implemented |
OR0421 # 03 Y:2002 | 03 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,751 | $9,925 | Not Implemented |
OR0421 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,964 | $5,062 | Implemented |
OR0421 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,148 | $6,309 | Implemented |
UF0306 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,153 | $5,064 | Implemented |
UF0306 # 02 Y:2002 | 02 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,764 | $7,800 | Not Implemented |
UF0306 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,327 | $0 | Implemented |
UF0306 # 04 Y:2002 | 04 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $592,558 | $1,120,000 | Not Implemented |
UF0306 # 05 Y:2002 | 05 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $10,048 | $0 | Not Implemented |
UF0306 # 06 Y:2002 | 06 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $48,671 | $1,074 | Not Implemented |
UF0306 # 07 Y:2002 | 07 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $208,938 | $33,980 | Not Implemented |
UF0306 # 08 Y:2002 | 08 | 2002 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $107,170 | $114,485 | Not Implemented |