IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0514 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $200 $0 Not Implemented
CO0514 # 05 Y:2002 05 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $18,470 $30,800 Not Implemented
OR0418 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,409 $1,400 Implemented
OR0418 # 02 Y:2002 02 2002 UPGRADE CONTROLS ON COMPRESSORS $6,865 $7,600 Implemented
OR0418 # 03 Y:2002 03 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,090 $1,800 Implemented
OR0418 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $929 $1,500 Implemented
OR0418 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,707 $9,446 Implemented
OR0422 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,067 $0 Implemented
OR0422 # 02 Y:2002 02 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $4,106 $2,000 Implemented
OR0422 # 03 Y:2002 03 2002 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $6,975 $5,500 Implemented
OR0422 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,944 $2,953 Implemented
OR0422 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $595 $0 Implemented
OR0421 # 01 Y:2002 01 2002 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $31,000 $12,000 Implemented
OR0421 # 02 Y:2002 02 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $27,311 $32,500 Implemented
OR0421 # 03 Y:2002 03 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,751 $9,925 Not Implemented
OR0421 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,964 $5,062 Implemented
OR0421 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,148 $6,309 Implemented
UF0306 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $5,064 Implemented
UF0306 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,764 $7,800 Not Implemented
UF0306 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,327 $0 Implemented
UF0306 # 04 Y:2002 04 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $592,558 $1,120,000 Not Implemented
UF0306 # 05 Y:2002 05 2002 RECOVER AND REUSE WASTE MATERIAL $10,048 $0 Not Implemented
UF0306 # 06 Y:2002 06 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $48,671 $1,074 Not Implemented
UF0306 # 07 Y:2002 07 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $208,938 $33,980 Not Implemented
UF0306 # 08 Y:2002 08 2002 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $107,170 $114,485 Not Implemented