IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0083 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,500 $370 Not Implemented
TA0083 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,350 $0 Not Implemented
TA0083 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $4,670 $910 Not Implemented
TA0083 # 07 Y:2004 07 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,263 $0 Not Implemented
TA0083 # 08 Y:2004 08 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,160 $0 Not Implemented
UM0270 # 01 Y:2004 01 2004 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $46,210 $29,000 Not Implemented
UM0270 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,116 $18,242 Not Implemented
UM0270 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,108 $11,108 Implemented
UM0270 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,376 $1,200 Not Implemented
UM0270 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $400 Implemented
SF0294 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,133 $0 Implemented
SF0294 # 02 Y:2004 02 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,624 $0 Not Implemented
SF0294 # 03 Y:2004 03 2004 INSTALL SPECTRAL REFLECTORS / DELAMP $1,702 $0 Not Implemented
SF0294 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,414 $22,970 Implemented
SF0294 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,833 $2,526 Not Implemented
SF0294 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,595 $32,955 Not Implemented
SF0294 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,895 $3,045 Not Implemented
SF0294 # 08 Y:2004 08 2004 USE PHOTOCELL CONTROLS $803 $1,378 Not Implemented
SF0294 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,917 $4,620 Not Implemented
SF0294 # 10 Y:2004 10 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,054 $0 Not Implemented
SF0294 # 11 Y:2004 11 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,801 $29,800 Not Implemented
SF0293 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $2,222 Not Implemented
SF0293 # 10 Y:2004 10 2004 OPTIMIZE PLANT POWER FACTOR $5,824 $6,094 Not Implemented
SF0293 # 11 Y:2004 11 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $62,747 $62,300 Not Implemented
MA0565 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $216,000 $125,000 Implemented