IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0537 # 10 Y:2019 10 2019 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $40,781 $21,000 Not Implemented
LS1911 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $651 $25 Not Implemented
LS1911 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,381 $174 Not Implemented
LS1911 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,929 $325 Not Implemented
LS1911 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,832 $1,736 Not Implemented
LS1911 # 05 Y:2019 05 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,758 $500 Not Implemented
LS1911 # 06 Y:2019 06 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,165 $22,200 Not Implemented
LS1911 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,502 $12,000 Not Implemented
SU0484 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $150 $14 Not Implemented
SU0484 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $370 $157 Implemented
SU0484 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,670 $15,784 Not Implemented
SU0484 # 04 Y:2019 04 2019 REPLACE BOILER $168,017 $185,420 Not Implemented
SU0484 # 05 Y:2019 05 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $236 $318 Implemented
SU0484 # 06 Y:2019 06 2019 REDUCE VENTILATION AIR $514 $929 Implemented
SU0484 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,516 $4,046 Implemented
SU0484 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $69 $30 Implemented
UD1003 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,324 $0 Not Implemented
UD1003 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,300 $4,100 Implemented
UD1003 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,920 $0 Not Implemented
UD1003 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,211 $0 Implemented
UD1003 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $2,159 $728 Not Implemented
UD1003 # 06 Y:2019 06 2019 USE PHOTOCELL CONTROLS $1,712 $3,540 Not Implemented
UD1002 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,369 $4,400 Implemented
UD1002 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,379 $1,000 Implemented
UD1002 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $881 $1,500 Not Implemented