Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0240 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $2,314 | $300 | Implemented |
UD0242 # 01 Y:1988 | 01 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,939 | $1,500 | Not Implemented |
UD0242 # 02 Y:1988 | 02 | 1988 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $6,954 | $22,000 | Not Implemented |
UD0242 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,684 | $750 | Implemented |
UD0242 # 04 Y:1988 | 04 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $15,137 | $30,000 | Not Implemented |
UD0242 # 05 Y:1988 | 05 | 1988 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $124,465 | $0 | Implemented |
UD0243 # 01 Y:1988 | 01 | 1988 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,000 | $10,000 | Implemented |
UD0243 # 02 Y:1988 | 02 | 1988 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,646 | $11,950 | Not Implemented |
UD0243 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,457 | $8,050 | Not Implemented |
UD0243 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,388 | $600 | Implemented |
UD0243 # 05 Y:1988 | 05 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $3,354 | $1,200 | Implemented |
UD0243 # 06 Y:1988 | 06 | 1988 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $812 | $0 | Implemented |
UD0244 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,643 | $1,000 | Implemented |
UD0244 # 02 Y:1988 | 02 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,077 | $935 | Implemented |
UD0244 # 03 Y:1988 | 03 | 1988 | INSTALL STORM WINDOWS AND DOORS | $8,290 | $3,000 | Implemented |
UD0244 # 04 Y:1988 | 04 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,365 | $5,000 | Not Implemented |
UD0237 # 01 Y:1987 | 01 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,394 | $200 | Implemented |
UD0237 # 02 Y:1987 | 02 | 1987 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $1,466 | $3,000 | Implemented |
UD0237 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,505 | $1,790 | Implemented |
UD0237 # 04 Y:1987 | 04 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $697 | $2,000 | Implemented |
UD0237 # 05 Y:1987 | 05 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,129 | $0 | Implemented |
UD0237 # 06 Y:1987 | 06 | 1987 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,305 | $67 | Implemented |
UD0237 # 07 Y:1987 | 07 | 1987 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,948 | $4,140 | Implemented |
UD0237 # 08 Y:1987 | 08 | 1987 | MINIMIZE WATER USAGE | $3,986 | $2,000 | Implemented |
UD0237 # 09 Y:1987 | 09 | 1987 | RECOVER AND REUSE COOLING WATER | $2,400 | $4,000 | Implemented |