IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0216 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,598 $2,500 Implemented
UD0216 # 03 Y:1987 03 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,753 $8,000 Implemented
UD0216 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,497 $17,500 Implemented
UD0216 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,656 $4,756 Implemented
UD0217 # 01 Y:1987 01 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,538 $5,000 Implemented
UD0217 # 02 Y:1987 02 1987 REDUCE GLAZED AREAS IN BUILDINGS $3,993 $20,000 Implemented
UD0217 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $5,444 $1,000 Implemented
UD0217 # 04 Y:1987 04 1987 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $20,387 $50,000 Not Implemented
UD0218 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,049 $5,470 Implemented
UD0218 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $3,039 $9,500 Not Implemented
UD0218 # 03 Y:1987 03 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $463 $129 Not Implemented
UD0218 # 04 Y:1987 04 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,481 $0 Implemented
UD0213 # 01 Y:1987 01 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,229 $20,000 Implemented
UD0213 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,000 $10,000 Implemented
UD0213 # 03 Y:1987 03 1987 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $45,881 $100,000 Not Implemented
UD0213 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,036 $2,000 Implemented
UD0213 # 05 Y:1987 05 1987 RECOVER WASTE HEAT FROM EQUIPMENT $6,181 $15,000 Implemented
UD0214 # 01 Y:1987 01 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,963 $3,000 Not Implemented
UD0214 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,230 $800 Implemented
UD0214 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $910 Implemented
UD0214 # 04 Y:1987 04 1987 COVER OPEN TANKS $1,924 $400 Not Implemented
UD0215 # 01 Y:1987 01 1987 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,028 $0 Implemented
UD0215 # 02 Y:1987 02 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $662 $140 Implemented
UD0215 # 03 Y:1987 03 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,008 $6,500 Not Implemented
UD0215 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $265 $300 Implemented