Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,377
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0034 # 10 Y:1985 | 10 | 1985 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $333 | $880 | Not Implemented |
ST0034 # 11 Y:1985 | 11 | 1985 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $942 | $78 | Not Implemented |
ST0035 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,841 | $13,140 | Implemented |
ST0035 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,014 | $240 | Implemented |
ST0035 # 03 Y:1985 | 03 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,300 | $2,180 | Not Implemented |
ST0035 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $106 | $0 | Implemented |
ST0035 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $177 | $285 | Not Implemented |
ST0035 # 07 Y:1985 | 07 | 1985 | COVER OPEN TANKS | $475 | $400 | Not Implemented |
ST0035 # 08 Y:1985 | 08 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $433 | $700 | Not Implemented |
ST0035 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,520 | $537 | Not Implemented |
ST0035 # 10 Y:1985 | 10 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,918 | $3,089 | Not Implemented |
ST0035 # 11 Y:1985 | 11 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,508 | $350 | Not Implemented |
ST0035 # 12 Y:1985 | 12 | 1985 | REDUCE GLAZED AREAS IN BUILDINGS | $1,130 | $4,848 | Not Implemented |
ST0035 # 13 Y:1985 | 13 | 1985 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $9,670 | $136 | Not Implemented |
ST0035 # 14 Y:1985 | 14 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,586 | $3,500 | Implemented |
ST0036 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,879 | $20,400 | Not Implemented |
ST0036 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,064 | $56 | Implemented |
ST0036 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,767 | $0 | Implemented |
ST0036 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $197 | $340 | Implemented |
ST0036 # 05 Y:1985 | 05 | 1985 | INSULATE BARE EQUIPMENT | $420 | $200 | Implemented |
ST0036 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $99,880 | $200,000 | Not Implemented |
ST0036 # 07 Y:1985 | 07 | 1985 | INSULATE BARE EQUIPMENT | $320 | $160 | Implemented |
ST0036 # 08 Y:1985 | 08 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $792 | $1,680 | Implemented |
ST0037 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,504 | $858 | Not Implemented |
ST0037 # 02 Y:1985 | 02 | 1985 | UPGRADE OBSOLETE EQUIPMENT | $43,200 | $19,000 | Not Implemented |