IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0169 # 06 Y:2000 06 2000 $13,013 $1,000 Not Implemented
UF0259 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,865 $2,831 Implemented
UF0259 # 02 Y:2000 02 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,242 $12,014 Not Implemented
UF0259 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,732 $7,400 Implemented
UF0259 # 04 Y:2000 04 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,323 $50 Implemented
UF0259 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,597 $460 Implemented
UF0259 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,740 $0 Implemented
UF0259 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $835 $1,500 Not Implemented
UF0259 # 08 Y:2000 08 2000 INSTALL OCCUPANCY SENSORS $481 $834 Implemented
UF0259 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $600 Implemented
UF0259 # 10 Y:2000 10 2000 METER WASTE WATER $2,940 $1,500 Implemented
UF0259 # 11 Y:2000 11 2000 $1,874 $3,721 Not Implemented
UF0259 # 12 Y:2000 12 2000 $67,200 $84,000 Not Implemented
OR0373 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,083 $6,300 Not Implemented
OR0373 # 06 Y:2000 06 2000 OPTIMIZE PLANT POWER FACTOR $950 $2,700 Not Implemented
OR0373 # 07 Y:2000 07 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $244,000 $110,000 Not Implemented
OR0373 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,100 $0 Implemented
OR0373 # 02 Y:2000 02 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $262 $0 Implemented
OR0373 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,186 $630 Not Implemented
OR0373 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,115 $11,205 Implemented
UM0173 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $573 $800 Not Implemented
UM0173 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $225 Not Implemented
UM0173 # 03 Y:2000 03 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $758 $700 Not Implemented
UM0173 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $3,506 $800 Not Implemented
UM0173 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,300 $750 Not Implemented