IAC logo
IAC Assessment: NC0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Fabric for shirts and home fashion
NAICS n/a
SIC 2210 -
Sales $100,000,000-$500,000,000
# of Employees 680
Plant Area (Sq.Ft.) 785,000
Annual Production 35,000,000 Pieces
Production Hrs. Annual 8,448
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,884,815 122,808,912 kWh $0.02
Electricity Demand $2,744,407 180,881 kW-months/year $15.17
Electricity Fees $218,049 - $ -
Natural Gas $505,889 120,209 MMBtu $4.21
TOTAL ENERGY COSTS $6,612,249
RECOMMENDED SAVINGS* $89,348 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,527
Cost:
$2,233
$828 35,170 $699 50 - - $828
35,170
kWh
$699
50
kW-months/year
-
-
Tgal
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$824
Cost:
-
- - $824 59 - - -
-
kWh
$824
59
kW-months/year
-
-
Tgal
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$56,972
Cost:
$10,000
$21,482 907,972 $35,490 2,208 - - $21,482
907,972
kWh
$35,490
2,208
kW-months/year
-
-
Tgal
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$24,065
Cost:
$105,600
$13,029 554,513 $11,036 787 - - $13,029
554,513
kWh
$11,036
787
kW-months/year
-
-
Tgal
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$5,960
Cost:
$2,500
- - - - $5,960 1,482,594 -
-
kWh
-
-
kW-months/year
$5,960
1,482,594
Tgal
TOTAL RECOMMENDED Savings:
$89,348
Cost:
$120,333
$35,339 1,497,655 $48,049 3,104 $5,960 1,482,594 $35,339
1,497,655
kWh
$48,049
3,104
kW-months/year
$5,960
1,482,594
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal