IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0058 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $11,800 $250 Implemented
DL0058 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,400 $100 Not Implemented
DL0058 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,080 $6,300 Not Implemented
DL0058 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,000 $7,644 Implemented
DL0058 # 09 Y:2010 09 2010 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,200 $10,000 Not Implemented
DL0058 # 10 Y:2010 10 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,110 $18,280 Not Implemented
DL0058 # 11 Y:2010 11 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,215 $2,500 Not Implemented
DL0058 # 12 Y:2010 12 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $5,050 Not Implemented
AM0580 # 01 Y:2010 01 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $696,440 $2,700,000 Not Implemented
AM0580 # 02 Y:2010 02 2010 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $627,000 $0 Not Implemented
AM0580 # 03 Y:2010 03 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $100,670 $0 Implemented
AM0580 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83,545 $208,000 Not Implemented
AM0580 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,000 $1,000 Implemented
AM0580 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,930 $150 Not Implemented
AM0580 # 07 Y:2010 07 2010 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,780 $1,520 Implemented
AM0580 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,950 $34,200 Implemented
AM0580 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,143 $1,880 Not Implemented
AM0580 # 10 Y:2010 10 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,270 $12,630 Not Implemented
AM0580 # 11 Y:2010 11 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $470 $120 Not Implemented
AM0580 # 12 Y:2010 12 2010 INSTALL SKYLIGHTS $220 $530 Not Implemented
CO0643 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $340 Implemented
CO0643 # 02 Y:2010 02 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $4,470 $27,000 Not Implemented
CO0643 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,270 $1,680 Not Implemented
CO0643 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $33,822 Implemented
CO0643 # 05 Y:2010 05 2010 REDUCE VENTILATION AIR $270 $1,290 Not Implemented