IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0257 # 11 Y:2018 11 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,204 $0 Not Implemented
MZ0257 # 12 Y:2018 12 2018 MINIMIZE WATER USAGE $37,478 $0 Implemented
UD0989 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,033 $0 Not Implemented
UD0989 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,291 $1,000 Not Implemented
UD0989 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,012 $0 Not Implemented
UD0989 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,885 $6,000 Not Implemented
UD0989 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,362 $1,935 Not Implemented
SD0570 # 01 Y:2018 01 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $9,960 $48,827 Not Implemented
SD0570 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,773 $20,484 Not Implemented
SD0570 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,329 $4,062 Not Implemented
SD0570 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,416 $2,000 Not Implemented
SD0570 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $1,089 $2,220 Not Implemented
SD0570 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $562 $200 Not Implemented
SD0570 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $322 $406 Not Implemented
SF0526 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,234 $70 Not Implemented
SF0526 # 02 Y:2018 02 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,043 $1,093 Implemented
SF0526 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $2,520 $1,157 Implemented
SF0526 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,205 $16,016 Implemented
SF0526 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,669 $5,876 Implemented
SF0526 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $8,414 $20,536 Implemented
SF0526 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,959 $22,846 Not Implemented
NC0614 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,207 $42,729 Not Implemented
NC0614 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $190 $350 Implemented
NC0614 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,801 $200 Implemented
NC0614 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $658 $2,700 Not Implemented