Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0172 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $546 | $0 | Implemented |
UD0173 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,989 | $21,000 | Implemented |
UD0173 # 02 Y:1985 | 02 | 1985 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,721 | $400 | Implemented |
UD0173 # 03 Y:1985 | 03 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $30,858 | $1,000 | Implemented |
UD0174 # 01 Y:1985 | 01 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,998 | $0 | Not Implemented |
UD0174 # 02 Y:1985 | 02 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $323 | $583 | Implemented |
UD0174 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,825 | $1,000 | Implemented |
UD0174 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $763 | $448 | Implemented |
UD0174 # 05 Y:1985 | 05 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,290 | $5,000 | Not Implemented |
UD0174 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $457 | $121 | Implemented |
UD0168 # 01 Y:1985 | 01 | 1985 | INSTALL SET-BACK TIMERS | $2,610 | $1,000 | Implemented |
UD0168 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $688 | $300 | Not Implemented |
UD0168 # 03 Y:1985 | 03 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,217 | $896 | Not Implemented |
UD0168 # 04 Y:1985 | 04 | 1985 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $536 | $0 | Not Implemented |
UD0168 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $506 | $0 | Implemented |
UD0169 # 01 Y:1985 | 01 | 1985 | INSTALL STORM WINDOWS AND DOORS | $2,965 | $3,680 | Not Implemented |
UD0169 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,315 | $178 | Implemented |
UD0169 # 03 Y:1985 | 03 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $849 | $0 | Implemented |
UD0170 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,355 | $1,543 | Implemented |
UD0166 # 01 Y:1985 | 01 | 1985 | RECOVER AND REUSE COOLING WATER | $10,849 | $7,160 | Implemented |
UD0166 # 02 Y:1985 | 02 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,600 | $40,000 | Implemented |
UD0166 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,258 | $50,000 | Implemented |
UD0167 # 01 Y:1985 | 01 | 1985 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,239 | $300 | Not Implemented |
UD0167 # 02 Y:1985 | 02 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,232 | $10,000 | Implemented |
UD0167 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $1,280 | Implemented |