IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0149 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,221 $2,000 Implemented
UD0149 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,360 $0 Implemented
UD0149 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $765 $276 Implemented
UD0149 # 04 Y:1985 04 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $332 $300 Implemented
UD0150 # 01 Y:1985 01 1985 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,440 $0 Implemented
UD0150 # 02 Y:1985 02 1985 INSTALL STORM WINDOWS AND DOORS $7,089 $4,000 Not Implemented
UD0150 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,196 $2,972 Not Implemented
UD0150 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $646 $140 Implemented
UD0150 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $702 $3,000 Implemented
UD0150 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,218 $1,360 Implemented
TS0005 # 01 Y:1985 01 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $24,815 $10,000 Not Implemented
TS0005 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,775 $18,500 Not Implemented
TS0005 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,545 $13,580 Not Implemented
TS0008 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,657 $0 Implemented
TS0008 # 02 Y:1985 02 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $18,700 $8,960 Not Implemented
TS0008 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $1,200 $3,000 Implemented
TS0008 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $588 Implemented
UD0144 # 01 Y:1984 01 1984 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $104,097 $320,000 Implemented
UD0145 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $21,141 $36,000 Not Implemented
UD0145 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,579 $19,613 Implemented
UD0145 # 03 Y:1984 03 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,148 $17,000 Not Implemented
UD0146 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,620 $0 Implemented
UD0146 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $598 $210 Implemented
UD0147 # 01 Y:1984 01 1984 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $5,049 $2,250 Implemented
UD0147 # 02 Y:1984 02 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $521 $600 Implemented