IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,903

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0014 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,512 $0 Implemented
UD1063 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,244 $297 Not Implemented
UD1063 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $760 $0 Not Implemented
UD1063 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $461 $952 Not Implemented
UD1063 # 04 Y:2023 04 2023 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $4,227 $2,191 Not Implemented
UD1063 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,201 $2,583 Not Implemented
UD1063 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $170 $200 Not Implemented
UD1063 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $3,994 $10,500 Not Implemented
MS0419 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $317 $1,202 Not Implemented
MS0419 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $256 $1,217 Not Implemented
MS0419 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,886 $0 Not Implemented
MS0419 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $47,025 $389,760 Not Implemented
MI0427 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,053 $1,060 Implemented
MI0427 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,947 $240 Not Implemented
MI0427 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,069 $4,697 Implemented
MI0427 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,790 $4,860 Not Implemented
MI0427 # 05 Y:2023 05 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,869 $100 Not Implemented
MI0427 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,805 $2,630 Not Implemented
MI0427 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,803 $791 Implemented
LS2314 # 01 Y:2023 01 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,310 $0 Implemented
LS2314 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,404 $135 Implemented
LS2314 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $3,222 $660 Not Implemented
LS2314 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,651 $11,390 Implemented
LS2314 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,291 $89,400 Not Implemented
LS2314 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $40,199 $309,000 Not Implemented