IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0171 # 01 Y:2015 01 2015 AIR CONDITION ONLY SPACE NECESSARY $1,588 $0 Not Implemented
MZ0171 # 02 Y:2015 02 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,781 $0 Not Implemented
MZ0171 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,759 $3,900 Not Implemented
MZ0171 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,783 $880 Not Implemented
MZ0171 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $870 Not Implemented
MZ0198 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,716 $0 Not Implemented
MZ0198 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $1,728 $1,750 Not Implemented
MZ0198 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $10,113 $2,500 Not Implemented
MZ0198 # 04 Y:2015 04 2015 CONDENSE OPERATION INTO ONE BUILDING $17,298 $1,040 Implemented
MZ0198 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $915 $250 Not Implemented
MZ0198 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $4,180 $17,000 Not Implemented
MZ0198 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,611 $1,500 Implemented
MZ0188 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,385 $0 Implemented
MZ0188 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,967 $10,000 Not Implemented
MZ0188 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,249 $1,000 Implemented
MZ0188 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,811 $0 Implemented
MZ0183 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $847 $1,500 Not Implemented
MZ0183 # 02 Y:2015 02 2015 ELIMINATE/REDUCE AN OPERATION $562 $0 Not Implemented
MZ0183 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,085 $980 Not Implemented
MZ0183 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,266 $3,750 Not Implemented
MZ0183 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,719 $10,000 Not Implemented
MZ0183 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $852 $0 Not Implemented
MZ0185 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $444,193 $2,686,745 Not Implemented
MZ0185 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,593 $7,228 Implemented
MZ0185 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,223 $0 Not Implemented