IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0562 # 09 Y:1995 09 1995 RECOVER AND REUSE WASTE MATERIAL $26,496 $26,600 Implemented
TN0562 # 10 Y:1995 10 1995 RECOVER AND REUSE WASTE MATERIAL $13,248 $26,200 Not Implemented
TN0562 # 11 Y:1995 11 1995 IMPROVE HANDLING PRACTICES $45,080 $25,000 Implemented
TN0562 # 12 Y:1995 12 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $50,142 $23,600 Not Implemented
NC0051 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,276 $570 Not Implemented
NC0051 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,978 $420 Implemented
NC0051 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,450 $12,000 Not Implemented
NC0051 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,438 $4,430 Implemented
NC0051 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $1,960 Not Implemented
NC0051 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,236 $3,200 Not Implemented
NC0051 # 07 Y:1995 07 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,190 $0 Implemented
NC0051 # 08 Y:1995 08 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $24,714 $18,000 Not Implemented
NC0051 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,325 $3,800 Not Implemented
TN0543 # 01 Y:1995 01 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $3,782 $910 Not Implemented
TN0543 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,817 $1,400 Not Implemented
TN0543 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,232 $0 Implemented
TN0543 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $739 $331 Implemented
TN0543 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $270 Not Implemented
TN0539 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $5,752 $408 Not Implemented
TN0539 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $2,452 $1,136 Not Implemented
TN0539 # 03 Y:1995 03 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,795 $236 Implemented
TN0539 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,551 $0 Implemented
TN0539 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,677 $417 Implemented
TN0539 # 06 Y:1995 06 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $544 $0 Implemented
TN0539 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,089 $1,000 Implemented