Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0648 # 09 Y:2013 | 09 | 2013 | USE SYNTHETIC LUBRICANT | $2,016 | $0 | Implemented |
AM0648 # 10 Y:2013 | 10 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,116 | $9 | Implemented |
AM0648 # 11 Y:2013 | 11 | 2013 | INSULATE BARE EQUIPMENT | $101 | $308 | Not Implemented |
UU0113 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,620 | $180 | Not Implemented |
UU0113 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $173,190 | $46,250 | Not Implemented |
UU0113 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,530 | $20,000 | Not Implemented |
UU0113 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $87,860 | $500,000 | Not Implemented |
UU0111 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $22,930 | $20,000 | Not Implemented |
UU0111 # 02 Y:2006 | 02 | 2006 | INSTALL COMMON HEADER ON COMPRESSORS | $1,760 | $8,000 | Not Implemented |
UU0111 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,680 | $1,560 | Not Implemented |
UU0111 # 04 Y:2006 | 04 | 2006 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,320 | $605 | Not Implemented |
UU0111 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,860 | $33,500 | Not Implemented |
UU0111 # 06 Y:2006 | 06 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $3,330 | $17,000 | Not Implemented |
UU0110 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,520 | $2,095 | Not Implemented |
UU0110 # 02 Y:2006 | 02 | 2006 | ISOLATE HOT OR COLD EQUIPMENT | $4,260 | $3,550 | Not Implemented |
UU0110 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,350 | $6,900 | Not Implemented |
UU0110 # 04 Y:2006 | 04 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $126,380 | $403,440 | Not Implemented |
UU0110 # 05 Y:2006 | 05 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,640 | $0 | Not Implemented |
UU0110 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,440 | $29,070 | Not Implemented |
UU0110 # 07 Y:2006 | 07 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $277,000 | $7,378,000 | Not Implemented |
UU0112 # 01 Y:2006 | 01 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $0 | $0 | Not Implemented |
UU0112 # 02 Y:2006 | 02 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $121,540 | $8,720 | Not Implemented |
UU0112 # 03 Y:2006 | 03 | 2006 | CLOSE OFF UNNEEDED STEAM LINES | $140,530 | $250,000 | Not Implemented |
UU0112 # 04 Y:2006 | 04 | 2006 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $69,680 | $200,000 | Not Implemented |
UU0112 # 05 Y:2006 | 05 | 2006 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $65,810 | $442,960 | Not Implemented |