IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0039 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,863 $0 Implemented
MZ0039 # 05 Y:2009 05 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $15,679 $18,600 Implemented
TT0038 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,940 $140,934 Not Implemented
TT0038 # 02 Y:2009 02 2009 REPAIR AND ELIMINATE STEAM LEAKS $21,918 $10,000 Implemented
TT0038 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,400 $4,170 Not Implemented
TT0038 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $839 $1,458 Not Implemented
TT0038 # 05 Y:2009 05 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,893 $0 Implemented
TT0038 # 06 Y:2009 06 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $33,000 $0 Not Implemented
TT0038 # 07 Y:2009 07 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,036 $1,600 Implemented
TT0038 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,000 $4,900 Implemented
TT0039 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,163 $16,183 Implemented
TT0039 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1 $0 Implemented
TT0039 # 03 Y:2009 03 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $77,380 $7,000 Implemented
TT0039 # 04 Y:2009 04 2009 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $36,266 $12,000 Implemented
TT0039 # 05 Y:2009 05 2009 IMPROVE COMBUSTION CONTROL CAPABILITY $112,568 $64,000 Not Implemented
TT0039 # 06 Y:2009 06 2009 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,012 $250 Not Implemented
TT0039 # 07 Y:2009 07 2009 OPTIMIZE PLANT POWER FACTOR $11,430 $13,000 Not Implemented
UD0803 # 01 Y:2009 01 2009 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $393,528 $8,000 Implemented
UD0803 # 02 Y:2009 02 2009 REPAIR OR REPLACE STEAM TRAPS $21,371 $3,376 Implemented
UD0803 # 03 Y:2009 03 2009 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $17,615 $84,000 Not Implemented
UD0803 # 04 Y:2009 04 2009 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $14,916 $25,000 Not Implemented
UD0803 # 05 Y:2009 05 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,360 $19,600 Not Implemented
UD0803 # 06 Y:2009 06 2009 REDUCE EXCESSIVE BOILER BLOWDOWN $9,743 $4,500 Not Implemented
UD0803 # 07 Y:2009 07 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,851 $500 Not Implemented
UD0803 # 08 Y:2009 08 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,627 $0 Not Implemented