Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0117 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,694 | $0 | Implemented |
UD0117 # 05 Y:1984 | 05 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $548 | $182 | Implemented |
UD0118 # 01 Y:1984 | 01 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,495 | $0 | Implemented |
UD0118 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,336 | $335 | Implemented |
UD0118 # 03 Y:1984 | 03 | 1984 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,044 | $0 | Not Implemented |
UD0118 # 04 Y:1984 | 04 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $24,598 | $126,000 | Not Implemented |
UD0119 # 01 Y:1984 | 01 | 1984 | REVISE SMOKE CLEANUP FROM OPERATIONS | $5,989 | $1,000 | Implemented |
UD0119 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,135 | $700 | Implemented |
UD0119 # 03 Y:1984 | 03 | 1984 | REDESIGN PROCESS | $683 | $2,000 | Implemented |
UD0119 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $162 | $700 | Implemented |
UD0120 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,558 | $83,000 | Implemented |
UD0114 # 01 Y:1984 | 01 | 1984 | UPGRADE OBSOLETE EQUIPMENT | $20,480 | $5,070 | Implemented |
UD0114 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,818 | $900 | Implemented |
UD0114 # 03 Y:1984 | 03 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $852 | $0 | Not Implemented |
UD0114 # 04 Y:1984 | 04 | 1984 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,038 | $4,000 | Implemented |
UD0114 # 05 Y:1984 | 05 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,377 | $33,750 | Implemented |
UD0114 # 06 Y:1984 | 06 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,899 | $0 | Implemented |
UD0116 # 01 Y:1984 | 01 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $22,546 | $27,000 | Not Implemented |
UD0116 # 02 Y:1984 | 02 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,320 | $3,000 | Implemented |
UD0116 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,013 | $670 | Implemented |
UD0116 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $18,628 | $99,000 | Implemented |
UD0116 # 05 Y:1984 | 05 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $28,956 | $69,700 | Not Implemented |
UD0116 # 06 Y:1984 | 06 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,705 | $3,000 | Not Implemented |
UD0113 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,926 | $62,859 | Implemented |
UD0113 # 02 Y:1984 | 02 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $15,633 | $4,906 | Implemented |