Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0103 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,488 | $32,763 | Implemented |
IP0103 # 07 Y:2018 | 07 | 2018 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $9,339 | $29,295 | Not Implemented |
IP0103 # 08 Y:2018 | 08 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $660 | $2,876 | Implemented |
IP0102 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,210 | $0 | Not Implemented |
IP0102 # 02 Y:2018 | 02 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $136 | $0 | Not Implemented |
IP0102 # 03 Y:2018 | 03 | 2018 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $10 | $0 | Not Implemented |
IP0102 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $759 | $629 | Not Implemented |
IP0102 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,705 | $10,744 | Not Implemented |
IP0102 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,737 | $35,615 | Not Implemented |
IP0101 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,806 | $46,651 | Implemented |
IP0101 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $498 | Implemented |
IP0100 # 06 Y:2018 | 06 | 2018 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,530 | $11,407 | Not Implemented |
IP0100 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $323 | $87 | Implemented |
IP0100 # 08 Y:2018 | 08 | 2018 | OPTIMIZE PLANT POWER FACTOR | $59,133 | $75,790 | Implemented |
IP0100 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $31,439 | $2 | Implemented |
IP0100 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,249 | $7 | Not Implemented |
IP0100 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $831 | $0 | Not Implemented |
IP0100 # 04 Y:2018 | 04 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,491 | $1,482 | Implemented |
IP0100 # 05 Y:2018 | 05 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,641 | $800 | Implemented |
IP0099 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,254 | $0 | Implemented |
IP0099 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,245 | $3 | Not Implemented |
IP0099 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,792 | $275 | Implemented |
IP0099 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,723 | $8,135 | Implemented |
IP0099 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,103 | $3,486 | Not Implemented |
IP0099 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $239 | $603 | Implemented |