IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0103 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,488 $32,763 Implemented
IP0103 # 07 Y:2018 07 2018 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $9,339 $29,295 Not Implemented
IP0103 # 08 Y:2018 08 2018 RECOVER WASTE HEAT FROM EQUIPMENT $660 $2,876 Implemented
IP0102 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,210 $0 Not Implemented
IP0102 # 02 Y:2018 02 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $136 $0 Not Implemented
IP0102 # 03 Y:2018 03 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $10 $0 Not Implemented
IP0102 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $759 $629 Not Implemented
IP0102 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,705 $10,744 Not Implemented
IP0102 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,737 $35,615 Not Implemented
IP0101 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,806 $46,651 Implemented
IP0101 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $498 Implemented
IP0100 # 06 Y:2018 06 2018 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $27,530 $11,407 Not Implemented
IP0100 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $323 $87 Implemented
IP0100 # 08 Y:2018 08 2018 OPTIMIZE PLANT POWER FACTOR $59,133 $75,790 Implemented
IP0100 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $31,439 $2 Implemented
IP0100 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,249 $7 Not Implemented
IP0100 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $831 $0 Not Implemented
IP0100 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,491 $1,482 Implemented
IP0100 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,641 $800 Implemented
IP0099 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,254 $0 Implemented
IP0099 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,245 $3 Not Implemented
IP0099 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,792 $275 Implemented
IP0099 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,723 $8,135 Implemented
IP0099 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,103 $3,486 Not Implemented
IP0099 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $239 $603 Implemented