IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0880 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $227 $798 Not Implemented
OK0880 # 07 Y:2014 07 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,087 $3,573 Not Implemented
OK0880 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $6,439 $6,993 Not Implemented
OK0880 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,385 $3,468 Not Implemented
OK0880 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $78 $376 Not Implemented
OK0879 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,268 $1,245 Implemented
OK0879 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,423 $7,826 Implemented
OK0879 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,769 $168 Implemented
OK0879 # 04 Y:2014 04 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,649 $1,014 Implemented
OK0879 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $39,930 $127,500 Not Implemented
OK0879 # 06 Y:2014 06 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,374 $29,700 Implemented
OK0879 # 07 Y:2014 07 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,751 $6,500 Not Implemented
OK0879 # 08 Y:2014 08 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $402 $237 Implemented
OK0879 # 09 Y:2014 09 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $29,530 $21,500 Not Implemented
OK0879 # 10 Y:2014 10 2014 INSULATE BARE EQUIPMENT $304 $148 Implemented
OK0879 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $3,829 Not Implemented
OK0879 # 12 Y:2014 12 2014 INSTALL OCCUPANCY SENSORS $587 $5,092 Not Implemented
OK0879 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $7,371 Not Implemented
OK0879 # 14 Y:2014 14 2014 INSTALL OCCUPANCY SENSORS $36,208 $5,120 Not Implemented
OK0879 # 15 Y:2014 15 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $155,454 $0 Not Implemented
OK0878 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,554 $1,400 Implemented
OK0878 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,459 $5,148 Implemented
OK0878 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,296 $1,222 Not Implemented
OK0878 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,905 $262 Implemented
OK0878 # 05 Y:2014 05 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $229 $525 Implemented