IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0039 # 09 Y:1985 09 1985 RECOVER WASTE HEAT FROM EQUIPMENT $413 $600 Not Implemented
ST0039 # 10 Y:1985 10 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $691 $537 Implemented
ST0039 # 11 Y:1985 11 1985 INSULATE BARE EQUIPMENT $1,068 $944 Implemented
ST0039 # 12 Y:1985 12 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $171 $74 Implemented
ST0039 # 13 Y:1985 13 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $539 $1,450 Not Implemented
ST0039 # 14 Y:1985 14 1985 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $6,854 $1,500 Not Implemented
UD0171 # 01 Y:1985 01 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,352 $4,773 Implemented
UD0171 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,014 $17,000 Implemented
UD0171 # 03 Y:1985 03 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $10,662 $38,000 Not Implemented
UD0171 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,744 $12,000 Not Implemented
UD0172 # 01 Y:1985 01 1985 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,203 $150 Implemented
UD0172 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,225 $50 Implemented
UD0172 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $123 Implemented
UD0172 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $546 $0 Implemented
UD0173 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,989 $21,000 Implemented
UD0173 # 02 Y:1985 02 1985 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,721 $400 Implemented
UD0173 # 03 Y:1985 03 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,858 $1,000 Implemented
UD0174 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,998 $0 Not Implemented
UD0174 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $323 $583 Implemented
UD0174 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,825 $1,000 Implemented
UD0174 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $763 $448 Implemented
UD0174 # 05 Y:1985 05 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,290 $5,000 Not Implemented
UD0174 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $457 $121 Implemented
CO0036 # 03 Y:1985 03 1985 REDESIGN PROCESS $593 $200 Implemented
CO0036 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,393 $200 Implemented