IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0272 # 16 Y:2004 16 2004 UTILIZE OUTSIDE CONTRACTING $57,614 $200 Implemented
BD0272 # 17 Y:2004 17 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $59,000 $15,000 Implemented
BD0272 # 18 Y:2004 18 2004 PAY BILLS ON TIME TO AVOID LATE FEES $20,740 $0 Not Implemented
LL0205 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,430 $1,080 Implemented
LL0205 # 02 Y:2004 02 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,365 $1,868 Not Implemented
LL0205 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,158 $30 Not Implemented
LL0205 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,067 $162 Not Implemented
LL0205 # 05 Y:2004 05 2004 USE PHOTOCELL CONTROLS $555 $120 Not Implemented
LL0205 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $521 $180 Not Implemented
LL0205 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $393 $245 Not Implemented
LL0205 # 08 Y:2004 08 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,750 $1,820 Implemented
UM0269 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,237 $600 Not Implemented
UM0269 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,834 $1,275 Not Implemented
UM0269 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,913 $2,890 Not Implemented
UM0269 # 04 Y:2004 04 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,128 $3,000 Not Implemented
UM0269 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,435 $2,000 Not Implemented
UM0269 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,285 $400 Not Implemented
UM0269 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $220 $276 Not Implemented
UM0268 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,159 $14,530 Not Implemented
UM0268 # 02 Y:2004 02 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,888 $840 Implemented
MA0564 # 01 Y:2004 01 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $20,000 $0 Not Implemented
MA0564 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,419 $10,531 Not Implemented
MA0564 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,406 $3,226 Not Implemented
MA0564 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $168 $75 Not Implemented
MA0564 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $548 Implemented