IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0803 # 09 Y:2009 09 2009 KEEP BOILER TUBES CLEAN $4,480 $1,000 Implemented
UD0803 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,845 $4,930 Not Implemented
UD0803 # 11 Y:2009 11 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,432 $0 Not Implemented
UD0803 # 12 Y:2009 12 2009 INSTALL OCCUPANCY SENSORS $1,959 $1,300 Not Implemented
UD0803 # 13 Y:2009 13 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,499 $1,479 Not Implemented
UD0803 # 14 Y:2009 14 2009 ISOLATE HOT OR COLD EQUIPMENT $1,120 $0 Not Implemented
UD0803 # 15 Y:2009 15 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $663 $1,125 Not Implemented
UD0803 # 16 Y:2009 16 2009 DISCONNECT BALLASTS $428 $0 Implemented
LE0291 # 01 Y:2009 01 2009 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $32,078 $50,000 Not Implemented
LE0291 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,489 $510 Not Implemented
LE0291 # 03 Y:2009 03 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,557 $2,500 Implemented
LE0291 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,457 $1,120 Implemented
LE0291 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,439 $1,600 Not Implemented
LE0291 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,837 $125 Not Implemented
LE0291 # 07 Y:2009 07 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,975 $3,460 Not Implemented
LE0291 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,836 $560 Implemented
LE0291 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,236 $81,400 Not Implemented
LE0291 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,803 $19,856 Not Implemented
LE0291 # 11 Y:2009 11 2009 INSTALL OCCUPANCY SENSORS $3,572 $1,050 Not Implemented
NC0393 # 01 Y:2009 01 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,824 $74,000 Not Implemented
NC0393 # 02 Y:2009 02 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,650 $1,000 Implemented
NC0393 # 03 Y:2009 03 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,020 $2,216 Implemented
NC0393 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $256 $100 Implemented
NC0393 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $967 $2,795 Implemented
UM0356 # 01 Y:2009 01 2009 RECOVER WASTE HEAT FROM EQUIPMENT $140,582 $6,000 Not Implemented