IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0443 # 02 Y:2017 02 2017 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $716 $675 Not Implemented
AS0443 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $27,764 $4,325 Implemented
AS0443 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,821 $140 Implemented
MZ0232 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,500 $25,000 Not Implemented
MZ0232 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,573 $6,000 Not Implemented
MZ0232 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,891 $10,000 Implemented
NL0009 # 01 Y:2017 01 2017 REDESIGN PROCESS $37,689 $38,000 Not Implemented
NL0009 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,263 $10,000 Not Implemented
NL0009 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,632 $4,788 Implemented
NL0009 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $691 $3,360 Implemented
IC0196 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,797 $22,558 Implemented
IC0196 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,243 $13,967 Implemented
IC0196 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,963 $1,299 Implemented
IC0196 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $273 Implemented
IC0196 # 05 Y:2017 05 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,350 $2,000 Not Implemented
IC0196 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,838 $1,500 Not Implemented
IC0196 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $100 Not Implemented
IC0196 # 08 Y:2017 08 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,319 $875 Not Implemented
IC0196 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,355 $500 Not Implemented
OK0972 # 01 Y:2017 01 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,060 $26,250 Not Implemented
OK0972 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,456 $650 Implemented
OK0972 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,025 $55,774 Not Implemented
OK0972 # 04 Y:2017 04 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,938 $27,750 Not Implemented
OK0972 # 05 Y:2017 05 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,380 $1,500 Implemented
OK0972 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,158 $47,096 Not Implemented