Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
242
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0404 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM THICKNESS INSULATION | $10,863 | $369 | Implemented |
UF0404 # 01 Y:2007 | 01 | 2007 | USE OPTIMUM THICKNESS INSULATION | $45,739 | $1,287 | Implemented |
UF0402 # 04 Y:2007 | 04 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,214 | $0 | Implemented |
UF0402 # 13 Y:2007 | 13 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $24,897 | $0 | Implemented |
UF0402 # 12 Y:2007 | 12 | 2007 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,259 | $8,400 | Not Implemented |
UF0402 # 11 Y:2007 | 11 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,118 | $1,373 | Not Implemented |
UF0402 # 10 Y:2007 | 10 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,194 | $390 | Implemented |
UF0402 # 09 Y:2007 | 09 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,931 | $2,136 | Not Implemented |
UF0402 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,006 | $1,413 | Not Implemented |
UF0402 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $3,641 | $194 | Implemented |
UF0402 # 06 Y:2007 | 06 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,315 | $57,868 | Not Implemented |
UF0402 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,361 | $80,399 | Not Implemented |
UF0402 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM THICKNESS INSULATION | $640 | $2,320 | Not Implemented |
UF0402 # 01 Y:2007 | 01 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $29,529 | $1,827 | Not Implemented |
UF0402 # 03 Y:2007 | 03 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $335 | $177 | Implemented |
UF0403 # 10 Y:2007 | 10 | 2007 | INSTALL SET-BACK TIMERS | $1,702 | $159 | Implemented |
UF0403 # 09 Y:2007 | 09 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $55,813 | $24,509 | Not Implemented |
UF0403 # 08 Y:2007 | 08 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,592 | $5,607 | Not Implemented |
UF0403 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,932 | $507 | Implemented |
UF0403 # 06 Y:2007 | 06 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,878 | $251 | Implemented |
UF0403 # 05 Y:2007 | 05 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,880 | $184 | Implemented |
UF0403 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $307 | $444 | Not Implemented |
UF0403 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,512 | $74,284 | Not Implemented |
UF0403 # 13 Y:2007 | 13 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $11,252 | $1,631 | Not Implemented |
UF0403 # 14 Y:2007 | 14 | 2007 | OPTIMIZE PLANT POWER FACTOR | $56,662 | $10,350 | Not Implemented |