IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

242

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0404 # 02 Y:2007 02 2007 USE OPTIMUM THICKNESS INSULATION $10,863 $369 Implemented
UF0404 # 01 Y:2007 01 2007 USE OPTIMUM THICKNESS INSULATION $45,739 $1,287 Implemented
UF0402 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,214 $0 Implemented
UF0402 # 13 Y:2007 13 2007 PAY BILLS ON TIME TO AVOID LATE FEES $24,897 $0 Implemented
UF0402 # 12 Y:2007 12 2007 LOWER CEILING TO REDUCE CONDITIONED SPACE $2,259 $8,400 Not Implemented
UF0402 # 11 Y:2007 11 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,118 $1,373 Not Implemented
UF0402 # 10 Y:2007 10 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,194 $390 Implemented
UF0402 # 09 Y:2007 09 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,931 $2,136 Not Implemented
UF0402 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,006 $1,413 Not Implemented
UF0402 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $3,641 $194 Implemented
UF0402 # 06 Y:2007 06 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,315 $57,868 Not Implemented
UF0402 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,361 $80,399 Not Implemented
UF0402 # 02 Y:2007 02 2007 USE OPTIMUM THICKNESS INSULATION $640 $2,320 Not Implemented
UF0402 # 01 Y:2007 01 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $29,529 $1,827 Not Implemented
UF0402 # 03 Y:2007 03 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $335 $177 Implemented
UF0403 # 10 Y:2007 10 2007 INSTALL SET-BACK TIMERS $1,702 $159 Implemented
UF0403 # 09 Y:2007 09 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $55,813 $24,509 Not Implemented
UF0403 # 08 Y:2007 08 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,592 $5,607 Not Implemented
UF0403 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,932 $507 Implemented
UF0403 # 06 Y:2007 06 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,878 $251 Implemented
UF0403 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,880 $184 Implemented
UF0403 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $307 $444 Not Implemented
UF0403 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,512 $74,284 Not Implemented
UF0403 # 13 Y:2007 13 2007 INSTALL TIMERS AND/OR THERMOSTATS $11,252 $1,631 Not Implemented
UF0403 # 14 Y:2007 14 2007 OPTIMIZE PLANT POWER FACTOR $56,662 $10,350 Not Implemented