Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
244
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0446 # 09 Y:2011 | 09 | 2011 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $1,662 | $8,210 | Not Implemented |
UF0446 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,055 | $43,715 | Not Implemented |
UF0446 # 02 Y:2011 | 02 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $6,009 | $1,320 | Not Implemented |
UF0446 # 03 Y:2011 | 03 | 2011 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $11,224 | $3,045 | Not Implemented |
UF0446 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $3,392 | $396 | Not Implemented |
UF0446 # 05 Y:2011 | 05 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,063 | $0 | Not Implemented |
UF0446 # 06 Y:2011 | 06 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $86,813 | $350,000 | Not Implemented |
UF0446 # 07 Y:2011 | 07 | 2011 | COVER OPEN TANKS | $2,910 | $1,175 | Not Implemented |
UF0446 # 08 Y:2011 | 08 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,593 | $25,700 | Not Implemented |
UF0445 # 05 Y:2011 | 05 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $43,678 | $2,580 | Not Implemented |
UF0445 # 04 Y:2011 | 04 | 2011 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $25,323 | $75,000 | Implemented |
UF0445 # 03 Y:2011 | 03 | 2011 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,693 | $939 | Not Implemented |
UF0445 # 02 Y:2011 | 02 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,543 | $9,823 | Not Implemented |
UF0445 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,864 | $4,542 | Implemented |
UF0445 # 06 Y:2011 | 06 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,582 | $2,580 | Implemented |
UF0445 # 07 Y:2011 | 07 | 2011 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $802 | $1,378 | Not Implemented |
UF0445 # 08 Y:2011 | 08 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $735 | $1,280 | Not Implemented |
UF0445 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,370 | $8,778 | Implemented |
UF0445 # 10 Y:2011 | 10 | 2011 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $118,931 | $150,000 | Not Implemented |
MI0210 # 11 Y:2011 | 11 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,145 | $8,889 | Implemented |
MI0210 # 04 Y:2011 | 04 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,342 | $1,350 | Not Implemented |
MI0210 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,568 | $175,700 | Not Implemented |
MI0210 # 02 Y:2011 | 02 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,559 | $7,338 | Not Implemented |
MI0210 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,805 | $1,320 | Implemented |
MI0210 # 10 Y:2011 | 10 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $8,346 | $10,000 | Implemented |