IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0017 # 03 Y:2008 03 2008 UPGRADE OBSOLETE EQUIPMENT $338 $2,199 Not Implemented
UW0016 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,638 $0 Implemented
UW0016 # 02 Y:2008 02 2008 REPLACE BOILER $10,000 $20,000 Not Implemented
UW0016 # 03 Y:2008 03 2008 REPAIR OR REPLACE STEAM TRAPS $5,490 $5,600 Not Implemented
UW0016 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $7,000 $500 Implemented
UW0016 # 05 Y:2008 05 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,625 $8,550 Implemented
UW0016 # 06 Y:2008 06 2008 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,510 $10 Not Implemented
UW0016 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $892 $0 Not Implemented
UW0015 # 01 Y:2008 01 2008 UPGRADE OBSOLETE EQUIPMENT $14,766 $42,706 Not Implemented
UW0015 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $3,180 Not Implemented
UW0015 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,010 $0 Not Implemented
UW0015 # 04 Y:2008 04 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $321 $189 Not Implemented
UW0014 # 01 Y:2008 01 2008 USE OPTIMUM THICKNESS INSULATION $118,896 $114,435 Not Implemented
UW0014 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,835 $57,573 Implemented
UW0014 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,004 $13,992 Not Implemented
UW0014 # 04 Y:2008 04 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,247 $70,905 Not Implemented
UW0014 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,513 $5,640 Not Implemented
UW0014 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,327 $1,500 Not Implemented
UW0013 # 01 Y:2008 01 2008 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $3,676 $593 Not Implemented
UW0013 # 02 Y:2008 02 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,365 $130 Not Implemented
UW0013 # 03 Y:2008 03 2008 UPGRADE OBSOLETE EQUIPMENT $1,913 $6,000 Not Implemented
UW0013 # 04 Y:2008 04 2008 USE SOLAR HEAT FOR HEAT $1,498 $4,250 Not Implemented
UW0013 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $544 $0 Implemented
UW0013 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $522 $1,787 Not Implemented
SF0366 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,775 $0 Implemented