Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
108
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW0017 # 03 Y:2008 | 03 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $338 | $2,199 | Not Implemented |
UW0016 # 01 Y:2008 | 01 | 2008 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $29,638 | $0 | Implemented |
UW0016 # 02 Y:2008 | 02 | 2008 | REPLACE BOILER | $10,000 | $20,000 | Not Implemented |
UW0016 # 03 Y:2008 | 03 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $5,490 | $5,600 | Not Implemented |
UW0016 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $7,000 | $500 | Implemented |
UW0016 # 05 Y:2008 | 05 | 2008 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,625 | $8,550 | Implemented |
UW0016 # 06 Y:2008 | 06 | 2008 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $5,510 | $10 | Not Implemented |
UW0016 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $892 | $0 | Not Implemented |
UW0015 # 01 Y:2008 | 01 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $14,766 | $42,706 | Not Implemented |
UW0015 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,107 | $3,180 | Not Implemented |
UW0015 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,010 | $0 | Not Implemented |
UW0015 # 04 Y:2008 | 04 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $321 | $189 | Not Implemented |
UW0014 # 01 Y:2008 | 01 | 2008 | USE OPTIMUM THICKNESS INSULATION | $118,896 | $114,435 | Not Implemented |
UW0014 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $40,835 | $57,573 | Implemented |
UW0014 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,004 | $13,992 | Not Implemented |
UW0014 # 04 Y:2008 | 04 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,247 | $70,905 | Not Implemented |
UW0014 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,513 | $5,640 | Not Implemented |
UW0014 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $2,327 | $1,500 | Not Implemented |
UW0013 # 01 Y:2008 | 01 | 2008 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $3,676 | $593 | Not Implemented |
UW0013 # 02 Y:2008 | 02 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,365 | $130 | Not Implemented |
UW0013 # 03 Y:2008 | 03 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $1,913 | $6,000 | Not Implemented |
UW0013 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT FOR HEAT | $1,498 | $4,250 | Not Implemented |
UW0013 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $544 | $0 | Implemented |
UW0013 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $522 | $1,787 | Not Implemented |
SF0366 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,775 | $0 | Implemented |