Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0349 # 09 Y:2007 | 09 | 2007 | COVER OPEN TANKS | $12,984 | $14,940 | Not Implemented |
AS0419 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,171 | $5,000 | Not Implemented |
AS0419 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,482 | $7,500 | Not Implemented |
AS0419 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,620 | $1,000 | Not Implemented |
AS0418 # 08 Y:2006 | 08 | 2006 | USE SOLAR HEAT TO HEAT WATER | $358 | $2,800 | n/a |
AS0418 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,386 | $3,000 | n/a |
AS0418 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,394 | $1,900 | n/a |
AS0418 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,272 | $1,000 | n/a |
AS0418 # 04 Y:2006 | 04 | 2006 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $6,612 | $550 | n/a |
AS0418 # 03 Y:2006 | 03 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,196 | $0 | n/a |
AS0418 # 02 Y:2006 | 02 | 2006 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $15,053 | $0 | n/a |
AS0418 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,182 | $15,913 | n/a |
AS0406 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,848 | $1,000 | Not Implemented |
AS0406 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $20,625 | $11,478 | Not Implemented |
AS0406 # 04 Y:2005 | 04 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $21,234 | $10,000 | Not Implemented |
AS0406 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,210 | $1,000 | Not Implemented |
AS0406 # 02 Y:2005 | 02 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $46,489 | $10,000 | Not Implemented |
AS0406 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $393,520 | $200,000 | Not Implemented |
AS0400 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,555 | $18,393 | Not Implemented |
AS0400 # 06 Y:2005 | 06 | 2005 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $150,000 | $80,000 | Not Implemented |
AS0400 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,951 | $100 | Not Implemented |
AS0400 # 03 Y:2005 | 03 | 2005 | INSTALL OCCUPANCY SENSORS | $224 | $750 | Not Implemented |
AS0400 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,262 | $5,000 | Not Implemented |
AS0400 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $289 | $500 | Not Implemented |
AS0399 # 04 Y:2005 | 04 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $318 | $506 | Not Implemented |