IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0074 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $186 $500 Implemented
UD0467 # 03 Y:1995 03 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,135 $150,000 Not Implemented
UD0467 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,434 $3,000 Implemented
UD0467 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $68,000 $72,000 Implemented
UD0466 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,108 $1,530 Not Implemented
UD0466 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,117 $640 Not Implemented
UD0466 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $816 $960 Not Implemented
UD0466 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,867 $3,000 Not Implemented
UD0466 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $627 $1,000 Not Implemented
UD0465 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $519 $0 Implemented
UD0465 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,058 $3,000 Implemented
UD0465 # 02 Y:1995 02 1995 CONVERT TO ROBOTIC PAINTING $232,030 $200,000 Implemented
UD0465 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,766 $3,255 Implemented
UD0465 # 01 Y:1995 01 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,418 $300 Implemented
WV0071 # 03 Y:1995 03 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $98 $187 Implemented
WV0071 # 02 Y:1995 02 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,374 $3,200 Implemented
WV0071 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,852 $600 Implemented
WV0071 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $4,513 $1,470 Not Implemented
WV0071 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $913 $720 Not Implemented
WV0071 # 06 Y:1995 06 1995 RECOVER AND REUSE WASTE MATERIAL $46,358 $10,000 Implemented
WV0070 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,743 $500 Implemented
WV0070 # 10 Y:1995 10 1995 REDUCE OR ELIMINATE WASTE $55,850 $25,220 Not Implemented
WV0070 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,269 $350 Not Implemented
WV0070 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,381 $1,000 Not Implemented
WV0070 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,089 $746 Implemented