Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0338 # 05 Y:2007 | 05 | 2007 | USE SYNTHETIC LUBRICANT | $1,378 | $2 | Not Implemented |
BD0338 # 06 Y:2007 | 06 | 2007 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $369,530 | $30,001 | Not Implemented |
BD0338 # 07 Y:2007 | 07 | 2007 | REPLACE BOILER | $36,792 | $110,001 | Implemented |
BD0338 # 08 Y:2007 | 08 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,864 | $12,000 | Not Implemented |
UA0013 # 07 Y:2007 | 07 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,856 | $0 | Implemented |
UA0013 # 06 Y:2007 | 06 | 2007 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,112 | $6,898 | Not Implemented |
UA0013 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM THICKNESS INSULATION | $3,027 | $279 | Not Implemented |
UA0013 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $17,411 | $13,088 | Implemented |
UA0013 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,315 | $47,838 | Implemented |
UA0013 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,905 | $0 | Not Implemented |
UA0013 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,423 | $700 | Implemented |
SF0350 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,467 | $9,827 | Not Implemented |
SF0350 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $644 | $4,267 | Not Implemented |
SF0350 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,126 | $2,145 | Not Implemented |
SF0350 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $399 | $492 | Implemented |
SF0350 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,274 | $1,332 | Implemented |
SF0350 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,920 | $300 | Implemented |
MI0158 # 10 Y:2007 | 10 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,886 | $2,000 | Implemented |
MI0158 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,073 | $40 | Implemented |
MI0158 # 08 Y:2007 | 08 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,282 | $3,475 | Not Implemented |
MI0158 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,478 | $5,967 | Not Implemented |
MI0158 # 06 Y:2007 | 06 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $13,330 | $1,700 | Implemented |
MI0158 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,507 | $1,210 | Implemented |
MI0158 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,963 | $20,900 | Implemented |
MI0158 # 03 Y:2007 | 03 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,358 | $46,238 | Not Implemented |