IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0919 # 05 Y:2018 05 2018 USE SOLAR HEAT FOR HEAT $41,493 $850,000 Not Implemented
GT0919 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,910 $55,885 Not Implemented
GT0919 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,045 $18,576 Implemented
GT0919 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $67,773 $8,000 Implemented
GT0919 # 01 Y:2018 01 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $21,617 $400 Not Implemented
MI0344 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $474 $760 Implemented
MI0344 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $1,536 $846 Implemented
MI0344 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,495 $2,030 Implemented
MI0344 # 06 Y:2018 06 2018 USE PHOTOCELL CONTROLS $3,042 $2,219 Implemented
MI0344 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $7,317 $9,570 Not Implemented
MI0344 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,313 $15,147 Implemented
MI0344 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,405 $6,666 Implemented
MI0344 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $12,638 $18,415 Not Implemented
MI0344 # 01 Y:2018 01 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $55,478 $62,800 Not Implemented
WM0128 # 12 Y:2018 12 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $200 Not Implemented
WM0128 # 11 Y:2018 11 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $637 $740 Implemented
WM0128 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $765 $600 Not Implemented
WM0128 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $1,172 Implemented
WM0128 # 08 Y:2018 08 2018 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,291 $533 Not Implemented
WM0128 # 07 Y:2018 07 2018 USE RADIANT HEATER FOR SPOT HEATING $1,744 $5,250 Implemented
WM0128 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,084 $0 Implemented
WM0128 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,496 $2,000 Implemented
WM0128 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,118 $19,300 Implemented
WM0128 # 03 Y:2018 03 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,244 $6,840 Not Implemented
WM0128 # 02 Y:2018 02 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $20,855 $48,500 Not Implemented